BB325DE / GCN 615873 / GRB 141020A

Source

Circulars: http://gcn.gsfc.nasa.gov/other/141020A.gcn3

Haven't yet looked at the correlated data.

V-FASTR Data

Correlated Data

On 22 oct oupdated phase center with the following:


Hi,

There is an updated position for this GRB.

Can you please correlate the BB325DE scans of GCN615873

With the following  ra/dec?

    RA  (J2000) =  14:59:59.15 = 224.99646 (deg.)
    Dec (J2000) = +55:18:46.7  =  55.31297 (deg.)

Cheers,

Keith

Observations

Observers Log



VERY LONG BASELINE ARRAY OBSERVING LOG
--------------------------------------
Project:        BB325DE
Observer:       Bannister, K.
Project type:   VLBA
Obs filename:   bb325decrd.*
Date/Day:       2014OCT20/293
Ants Scheduled: HN NL OV BR 

=UT-Time===Comment===============================================MF#===%AD==AMD=
           Operator is Paul Padilla                                             
           UT1-UTC: -0.37, VClock: -0.015, GPS delta: -4.2                      
           Files were only made for HN, NL, OV, and BR.                         
           Possibly related, SC and PT would be unavailable for                 
           use due to upcoming USNO run.                                        
           MK would also not be available due to a recent                       
           lightning strike.                                                    
     0809  Begin                                                                
     0841  NL,OV,BR end                                                         
     0844  End.                                                                 


Downtime Summary:
   Total downtime : 0 min
   Percentage downtime of observing: 0.0%
   Average downtime per hour : 0.0 min

    Total scheduled observing time (# Antennas): 140 min (4)

Notes:
    * = Entries where data was affected.
    % = Entries where data may have been affected.
    & = Entries where the site tech was called out.
  WEA = Weather entries.
  MF# = Maintenance form or major downtime category associated with a problem.
  %AD = The percentage of an antenna affected by a problem.
  AMD = Total antenna-minutes downtime for a problem.
 Tsys = System Temperature (TP/SP x Tcal/2)
  ACU = Antenna Control Unit
  FRM = Focus/Rotation Mount
  RFI = Radio Frequency Interference
  VME = Site control computer
   CB = Circuit Breaker
 vclock = Program that compares site clock time to a standard.


-- KeithBannister - 2014-10-22
Topic revision: r1 - 2014-10-22, KeithBannister
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback