TAC Updated Priorities, Plots. The VLBA document is done; the VLA document should be done soon; and the GBT document may be done by the afternoon. We will try to send all of them out together but if the GBT slips until tomorrow we will send it later. The TAC agenda link will be included in the document.
TAC Communications. MarkClaussen has tested the Polycom with two TAC members. One seemed to work fine, whereas the other worked okay but could not display video and content at the same time. DanaBalser will put the WebEx instructions on the wiki page in case anyone needs to display this information. There is a planned power outage in GB on Monday (19 Oct). It should not effect the GB site but is nearby. If the GB site looses power then we will not be able to use the GB PHT. This is typically used to enter data during the TAC meeting, and occasionally to redo pressure plots. We should know by 8 EDT, before the TAC meeting begins, so if the power is indeed out then we can move GBT to the end of the schedule.
AOB
BarryClark notes that we should make sure to get feedback from the TAC on the new material we have composed for 16A.