  • 21B
  • 22A
    • PST CfP Requirements (Lorant)
      • SSA-6899 PST: offer eLWA as SRO in 22A: 5 days
      • SSA-6889 Remove selection box for Ar in VLBA/HSA Resources: 1 day
      • SSA-6888 VLBA/GMVA GST Range TJ text / Session Popup: 0.5 day
      • SSA-6130 PST: Sci Just size: 1 day (same as SAA-6859)
      • SSA-2200 PST: Problems uploading large source lists: 3 days (same as SSA-6596)
      • SSA-6594 PST: max to entering TJ? 3 days
      • SSA-6592 PST: entering TJ sometimes loses text: 3 days
      • SSA-2964 PST: Withdraw Proposal Problem: 1 day
      • SSA-2851 PST: Re-submit Feature: 3 days
      • SSA-6901 Modify text in VLBA "Stations Requested" TJ cue: x days
      • SSA-6858 Warning displays as error for subband max for VLBA: 0.5 day
  • AOB

Minutes

Attending: DanaBalser, MarkClaussen, ToneyMinter, AnandCrossley, RickLively, HediMedlin, TrishHenning, LorantSjouwerman, AmyMioduszewski, BarryClark

  • 21B
    • TAC Large Proposal Meeting. DanaBalser summarized the scheudling issues with the TAC Large proposal meeting. The GWT chair can only attend the first hour, the SFM chair can only attend the second hour, and the AGN chair cannot attend. An AGN SRP member will act as chair pro tem and connect to the meeting only to discuss the one AGN Large proposal (LP). ToneyMinter said he will need more time to dicuss GBT issues. We agreed to the following plan. We start with the VLA summary and the GWT LP, then move to the GBT summary and the VLA/GBT joint PCO LP. Then we move back to the two VLA SFM LPs. After this we go back to the GBT and then VLBA. DanaBalser will modify the agenda and inform the TAC chair.
  • 22A
    • PST CfP Requirements. LorantSjouwerman led the discussion of the various JIRA tickets organized by Capabilities and Maintenance, Significant Bugs, and Other. Below is a Table that summarizes our discussion.

ID Title Time PrioritySorted descending Comment
SSA-6858 Warning displays as error for subband max for VLBA 0.5 Major Nice to fix.
SSA-6899 PST: offer eLWA as SRO in 22A 4 Critical Resource update. We cannot simply change the labels since these are tied to resources in the PST. So we need to create a new resource. This was rescoped from 5 to 4 days.
SSA-6889 Remove selection box for Ar in VLBA/HSA Resources 1 Critical Resource update. Remove Ar only for new proposals.
SSA-6901 Modify text in VLBA "Stations Requested" TJ cue 0.5 Critical Resource update.
SSA-6907 Search filters need 2022+ added 0.5 Critical We need to be able to filter for the new semester.
SSA-6908 Technical Justification folders left on server 0.5 Critical This may be important and related to the new autosave feature. We rescoped this from 3 to 0.5 days to at least investigate.
SSA-6888 VLBA/GMVA GST Range TJ text / Session Popup 0.5 Critical Discussed this issue a lot in the past. Causes confusion.
SSA-6592 PST: entering TJ sometimes loses text 3 --- This may require a lot of time to investigate.
SSA-2964 PST: Withdraw Proposal Problem 10 --- We have already spent 10 days in the past with no success. Thus far we have been unable to reproduce this issue. We agreed to lobby SSA/DMS for 10 extra days (rescoped from 1 to 10 days).
SSA-2851 PST: Re-submit Feature 3 --- We agreed that this is a better solution but may be dangerous to implement given the PST structure.
SSA-6594 PST: max to entering TJ? 3 --- Does not occur too often.
SSA-6903 GOST label 22A and after 0.5 --- Not discussed.
SSA-6904 PST: prefer RCT over GOST 4 --- Not discussed.
SSA-6130 PST: Sci Just size 1 --- Not discussed (same as SAA-6859).
SSA-2200 PST: Problems uploading large source lists 3 --- Not discussed (same as SSA-6596).

-- DanaBalser - 2021-03-24
Topic revision: r4 - 2021-03-25, DanaBalser
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback