Thursday, 1:30pm MT, 3:30pm pm ET, 18 September 2025

Logistics

NRAO Zoom 02

Agenda

  • 26A
    • SRP Meetings (Dana, Amy, Robert, Allie)
    • Large Proposal TAC Meeting (Dana)
    • TAC Meeting (Dana)
  • 26B
    • PST CfP Prioritization (Allie)
  • AOB

Minutes

Attending: DanaBalser, ToneyMinter, AnandCrossley, HeidiMedlin, AnthonyRemijan, YlvaPihlstrom, AllieCosta, JimSheckard, AmyMioduszewski, JayFrothingham

  • 26A
    • SRP Meetings. AmyMioduszewski noted that the GWT went through all of the proposals but it was painful given the large load; need to keep an eye on the numbers. AllieCosta reported that one Large proposal in SSP did not have a valid Data Management plan, and one proposal in SFM used in-line references. We have no policy on the latter but standard practices are to include a proper reference list. DanaBalser noted that EGS went a bit over but also only had four total hours. There are two SRPs that have not quite finalized their reviews. Once done DanaBalser will email the TTA list.
    • Large Proposal TAC Meeting. The Large Proposal TAC meeting in on 3 October 2025 (Time TBD); the plan is to release information to the TAC on 29 September 2025 (this will probably be delayed one day).
    • TAC Meeting. The regular TAC meeting will be in CV on 14-15 October 2025. Please provide JessicaBurns with your travel plans even if you do not need lodging.
  • 26B
    • PST CfP Prioritization. AllieCosta led the discussion. We went through and assigned a preliminary priority for each item (see below). We want to make sure we complete the special call tickets (SSA-8351 and SSA-8381) which are in progress. So the plan is that JimSheckard, AllieCosta, and DanaBalser will test these on Monday, 22 September 2025. This will provide us with how much time we might have left in our 10 day cutout. We will finalize the prioritization next week.

Key Summary Estimate Priority Comment
SSA-8508 GBT will accept large proposals for all semesters starting in 26B 1.5d Must do
SSA-8495 Remove NICER from available joint facilities in PST for 26B 0.5d Must do
SSA-8482 Add ngRADAR sponsored program option to PST 0.5d Must do
SSA-8516 Update text on justification page for VLBA and GMVA and increase PDF upload size limit 1d High
SSA-8487 RSRO Comments not included in PDF 3d Med-high
SSA-8366 Remove warning about GST range 0.25d Med
SSA-8511 Repurpose "Geodetic" field 1.5d Med-low
SSA-8365 Change default LST/GST range 0.25d Med-low
SSA-8359 Catch illegal characters in uploaded filenames 3d Med-low
SSA-8354 Update stations for GMVA 2d Med-low
SSA-8056 Change some field names on UI for Vega resources 0.75d Med-low
SSA-8473 VLBA resource options limited for RSRO observing 5d Low
SSA-8437 PST: Add instruction for observing type(s) for VLA 1d Low
SSA-8275 Enable forwarding to referenced link for baseband copy alert 0.75d Low
SSA-8216 Remove ability to select 'dual' polarization if only single baseband channel selected 0.5d Low
SSA-8201 PST - valid VEGAS pulsar modes unselectable in "Resources" tab 5d Low
SSA-8199 Update Email Recipients for Conflicts Notifications 0.5d Low
SSA-8197 Prevent future Techincal Justification overflow errors 3d Low
SSA-8195 Institution request shows the user a confusing message 0.75d Low
SSA-8083 Sub-Integration Time field for Vegas Pulsar 1.5d Low
SSA-7989 GBT Vegas pulsar resource bank should not reset to 1 on an edit 2d Low
SSA-7258 PST institution search fails 2d Low
SSA-6451 PST organization generating error 1d Low
SSA-8351 Add new special call proposal type 15d In progress
SSA-8381 Once the new special call proposal type is added to the PST, the PHT needs to handle the new type 3d In progress

-- DanaBalser - 2025-09-17