Thursday, 9 am MT, 11 am ET, 01 March 2018

Logistics

CV-331/AOC-152/GB-bsm, 331 Hub 192.33.117.12##6519 Audio 434-817-6286

Agenda

  • 18B
    • SRP Telecons
      • Schedule and Support (JJ)
      • Guidelines (Dana)
    • Technical Reviews (Toney, Lorant)
    • Science Reviews (Dana)
    • PST Review Items (Rick, Dana)
    • PHT Requirements (Amy, Barry)
    • TTA Meeting Schedule (Dana)
  • AOB

Minutes

Attending: DanaBalser, JaredCrossley, JessicaUtley, GarethHunt, BarryClark, RickLively, LorantSjouwerman, AmyMioduszewski, HeidiMedlin, ToneyMinter

  • 18B
    • SRP Telecons
      • Schedule and Support. JessicaUtley reported that all of the telecon dates are set. The last telecon is a week later than the nominal telecon window but still should give us enough time to prepare for the TAC meeting. She has recruited someone to cover her for the telecons that overlap. We have not converged yet on the technical support schedule.
      • Guidelines. DanaBalser has modified the guidelines to emphasize that they read the technical reviews and include anything important in the TAC only comments. He will check with LewisBall if there is an update to the gender info.
    • Technical Reviews. ToneyMinter reported that the GBT reviews are done. BarryClark reported that the VLA/VLBA/GMVA reviews are done and that he has vetted the VLA reviews. MarkClaussen reported offline that he still needs to vet the VLBA/GMVA reviews and will try to do so by Friday. BarryClark said he would take a quick look at the VLBA/GMVA reviews today. LorantSjouwerman reported that there were a few items from the technical review postmortem and he will forward these later.
    • Science Reviews. DanaBalser reported that all SRP assignment have been made. The nominal deadline is today (1 March), but the deadlines have been extended for most SRPs since many have telecons that start later in the telecon window.
    • PST Review Items. RickLively reported on updates to the PST: (1) updated the SRP Review csv-formatted file; and (2) fixed how the mean normalized score was calculated (we were excluding negative numbers). He also checked the various flags to make sure they make sense or does not include these in the mean. The plan is to copy to webtest once the reviews for one SRP are complete and then check the normalization. At the latest we need to release to production by 2 March (Friday).
    • PHT Requirements. AmyMioduszewski prioritized the PHT tickets. After some discussion we agreed to try and do the following tickets: disposition tickets (3723, 3935, 4397) and pressure plot tickets (4421, 4422, 4423). If there is time RickLively will look at 2072 (fixed-date priority for VLA), but this one is a bit complicated since it has dependencies in the PBT and OPT.
    • TTA Meeting Schedule. Because of the SRP telecons there will be no meeting for the next two week; the next TTA meeting will be on 22 March. Also, due to travel there will not be a meeting on 29 March.
  • AOB
    • Session-less PST. LorantSjouwerman inquired about the status. DanaBalser reported that the recommendation is to abandon the Session-less PST but this will be discussed at the UC meeting.

-- DanaBalser - 2018-02-23
Topic revision: r5 - 2018-03-01, DanaBalser
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback