Duplicate Auhtors

NRAO Interactive Services Modification Request 5C209, June 2009



1. Introduction

Why do we need this?

2. Background

Why do we care? What situation came up that let us know we had to do this? What other systems/people will we impact here?

3. Requirements

  • 1
  • 2
  • 3

4. Design

Technical lead should provide a brief description of how this will be implemented in the code.

5. Deployment Checklist

Documentation? Systems/hardware/networking things needed for deployment?

6. Test Plan

6.1 Internal Testing

6.2 Sponsor Testing

6.3 Integration/Regression Tests


Signatures

APPROVED: I acknowledge that my request is fully contained in this MR, and if the Open Sky (or other NIS or PST developers) deliver exactly what I specified, I will be happy.

ACCEPTED: I acknowledge that I have validated the completed code according to the acceptance tests, and I am happy with the results.

Written - - - - -
Checked - - - - -
Approved by Scientific Sponsor - - - - -
Accepted/Delivered by Sponsor - - - - -

Symbols:
  • Use %X% if MR is not complete (will display ALERT!)
  • Use %Y% if MR iscomplete (will display DONE)


Discussion Area

-- DanaBalser - 2009-02-17

This topic: Software > ProposalSubmissionTool > IntxSvcsPlanOfRecordC22009 > IntxSvcsMR5C209