Merge BOS with my.nrao.edu User Database

NRAO Interactive Services Modification Request 11 T3 2010



1. Introduction

2. Background

3. Requirements

4. Design

Technical lead should provide a brief description of how this will be implemented in the code.

5. Deployment Checklist

Documentation? Systems/hardware/networking things needed for deployment?

6. Test Plan

6.1 Internal Testing

6.2 Sponsor Testing

6.3 Integration/Regression Tests


Signatures

APPROVED: I acknowledge that my request is fully contained in this MR, and if the Open Sky (or other NIS or PST developers) deliver exactly what I specified, I will be happy.

ACCEPTED: I acknowledge that I have validated the completed code according to the acceptance tests, and I am happy with the results.

Written - - - - -
Checked - - - - -
Approved by Scientific Sponsor - - - - -
Accepted/Delivered by Sponsor - - - - -

Symbols:
  • Use %X% if MR is not complete (will display ALERT!)
  • Use %Y% if MR iscomplete (will display DONE)


Discussion Area

-- DanaBalser - 2010-10-26

This topic: Software > UserDatabase > UserDatabasePlanOfRecordT32010 > IntxSvcsMR12T310
Topic revision: 2010-10-26, DanaBalser
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback