  • Future Meeting dates (usually last Wed of the month):
    • 2019 May 29
    • 2019 Jun 26?
    • 2019 Jul 31?
    • 2019 Aug 28?

General Admin

  • CASA 5.5
    • Release pending (VLASS and related imaging fixes in progress)
    • CASA 6.0 now to coincide with CASA 5.6
  • CASA 5.6/6.0
    • Requirements process complete, see CASA 5.6 Confluence page
    • Feature freeze: 2019 Jun 07; for other dates, see Confluence page
    • (Mark) CASA 6 build environment?
  • Other admin?

Verification/Validation/Documentation

  • (Mark) Testing of fringe fitting with a model... status?
  • (Mark) EVN archival data issue and importfitsidi... status?
  • Other?

Development/Features

  • (Mark) Requirements collation
  • (Mark) New integration branch...status?
  • Items for CASA 5.6/6.0 development
    • (George) CASA 6 VLBI task interface verification
      • (Mark) fringefit task not present yet
    • (George) Look into correlation-dependent flagging issue (CAS-695)
    • (Walter) Advanced VLBA Amplitude calibration a la Walker memo from a few years ago
      • Bandpass normalization flexibility: voltage vs. power
    • (Des) Baseline stacking
    • (Des) Wide bandwidth and dispersive
    • (George) perscan interpolation option?
    • (George) consider overlapping solution intervals?

AOB?

Topic revision: r2 - 2019-04-24, MarkKettenis
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback