Build & Test Design Review

Introduction

Planning page for the upcoming review of the CASA Build & Test System.

Tasks

  1. Define the scope of the B&T System.
  2. Define the scope of the B&T Review.
  3. Develop a (rough) plan to execute the review
    1. Review deliverables
    2. Schedule of tasks
  4. Define the Concept of Operations of the B&T System (how we use the B&T system)
  5. Define the Operational Requirements for the B&T System
  6. Define the Functional and performance requirements for the B&T System.
  7. Define the verification and validation strategy for the system.
  8. Define a System Architecture & lower level specifications, derived from the system requirements.
  9. Design the sub-systems that comprise the B&T system.
  10. Develop an implementation plan to realize the as-designed system.

Review Deliverables

Schedule

BT-Review-Schedule.png

-- RobSelina - 2014-05-28
Topic attachments
I Attachment ActionSorted ascending Size Date Who Comment
BT-Review-Schedule.pdfpdf BT-Review-Schedule.pdf manage 106 K 2014-05-29 - 13:00 RobSelina PDF of Schedule
BT-Review-Schedule.pngpng BT-Review-Schedule.png manage 352 K 2014-05-29 - 13:00 RobSelina PNG of Schedule
Topic revision: r4 - 2014-06-19, MarkRawlings
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback