L1/L2 Verification renamed to Functional/Numerical Verification
Bamboo test plan updates
Remove old tests
Add test_refimager in parallel mode
Note: Easter bank holidays in Germany: Fri 19 - Mo 22.
Development
Calibration and Flagging
N/A
Imaging
VLASS Imaging/Verification update
Data Visualization
N/A
Import / Export
N/A
Infrastructure
N/A
Simulation
N/A
CASA 6
imager control from python
added shutdown interface
succeeded in opening viewer panel via grpc
UVcontsub
Re-defining requirements (within CASA-dev) and presenting to Stakeholders (Apr 24).
Build / Testing
Infrastructure
N/A
Unit
N/A
Verification
Testing docker to deploy different CASA test environments
What is the status of the gaincal merge, George? See the PR here
First VLASS Level 2 verification test is ready (need to coordinate with Andy et al about where to put it and how to run it)
Starting the process of requesting purchase for new build/test hardware
Validation
CAS-12168, more testing
CAS-9108 et al, more testing/set up a polarization workflow
CAS-11460, finalize testing
CAS-7210, more testing (there's a list)
CAS-9621, testing (both mtmfs with multi scale and multi scale in cube)
CAS-5740, revamp testing
CAS-10518, test
CASA 6 general testing (not 5.6, but simultaneous to it)
CAS-12381, viewer testing (need to get somebody for this ASAP)
User Liaison Updates
CASA Newsletter: publication date Wed April 24. Should we postpone Newsletter until CASA 5.5 is released?
CUC mid-term update with new chair D.J. Pisano: proposed dates April 23, 25, May 8, 9
Pipeline Updates
Long header keyword in CASA image: agreed with a solution for VLA ( PIPE-325)
VLA regression failure: Brian created a ticket ( CAS-12412) assigned to Kumar. tclean result, e.g., RMS, differs in a several percent level on RHEL6 and 7.
ALMA related: python 3 and RHEL7 migration meetings took place last week.
RHEL7: NAASC started to migrate to RHEL7. JAO follows in May. EU and EA later.
python 3 migration of almasw: start work in 2020. target cycle is Cycle 9