USNO VLBA Support Meeting
*July 11, 2013 Time 11 am Mountain, 1pm Eastern *
Phone: 575-835-7170
USNO:
NRAO: Durand, Ford, Perley, Rowe, Brisken
Agenda: Allen, Chris, Nicole, John
- Previous Action items: none
- Correlator:
- Power outage: did last power outage shutdown and restart work?
- USNO: Nicole doesn't recall powering off infrastructure nodes, works fine with computing nodes.
- NRAO: We thought there were issues with last power up
- USNO: Special situations are no longer issue, USNO Action: Will follow up with IT department, regarding what K. Scott sent and which option is best.
- Upcoming deliverables: Direct delivery of nodes to USNO in ~September
- Walter will be at USNO starting July 17th for a week, covering SW correlator and anything else that comes up
- MK/PT Status
- Recent Failures and Observation Modification
- Masers were replaced at both sites, both working very well
- NRAO is in process of obtaining a good spare (through lease from 4T)
- Frequency Setup Change Possibility?
- Walter: Chris discussed possibility and Walter needs to ask questions about # of channels, etc.
- Action to Walter: To work with Chris and get back up to speed on idea
- USNO retrieval of NRAO correlated data
- Chris has not figured out how to retrieve data and what USNO has access to.
- Walter: my.nrao.edu is starting point, email Paul Dyer, Meri Stanely (analysts@nrao.edu)
- Peggy: Analysts can keep USNO up to date with what has been correlated.
- Action to Walter: VEX files need Allen IDed as PI
- Daily Observation Report.
- If more than 15 minutes lost NRAO will do a re-observation.
- June was a rough month.
- Chris: Worked on clock offsites, agrees that 15 minutes is a good cutoff. It took effort to get fringes due to clock offsets.
- Around 3170, there was a big swing in clock offsets and settled back down by 3176.
- Action NRAO: Starting June 19th, offsets drifted about 300 ns between each experiment until Mark5C recording was brough back on 25th. Then stable (10-20ns drift). Steve to investigate.
- Daily Observations contract renewal
- Current contract has been funded for 6 months
- Period of performance is July 18 2013 -January 17, 2014
- Open issues
- Plan Walter's visit to USNO
- Next meeting on August 8th. Action to Steve: arrange a hub.
- Nicole: Is redhat 6.4 compatible with DifX? Walter: concern would be if the kernel version is jumped to a new level that the drivers don't support.
--