USNO VLBA Support Meeting
Date: January 8th 2015
Time: 11 am Mountain, 1pm Eastern
Phone: 434-817-6584
Attending:
USNO: Chris, Alan, Nicole, Dan, Dave, John
NRAO: Ephraim, Jim, Doug, Walter, James
Agenda
Status
- Correlator:
- Still in transition stage, hardware correlator is out.
- Waiting on power audit of room before starting Phase 2. Action USNO: Dave to get audit done
- Dan: As far as operations go, just keeping up with what is needed due to bandwidth and network restrictions
- LUSTRE is largely sitting unused
- James: Initial work of getting Mark5's booting done, but what are next steps for functional issues?
- Dan: We had it booting with proper environment and started with Mark5 daemon.
- Question on whether commands were being communicated properly with Mark5 - work with Walter, John.
- As part of testing, USNO rebooted and it rebooted into an old state where environment wasn't loading correctly.
- James: Let's set up a separate meeting to work through punchlist of items (John is available, Walter ok for Tuesday next week).
- Walter: It would be useful to do this on 2 units simultaneously. Dave: Agreed.
- James: Action USNO: Send MAC, Host addresses to James.
- Validation DiFX 2.4
- This version is being readied for public announcement
- Walter: hoping to get any blessing from USNO to proceed.
- Goal is to release this soon - Dan: would like to run through another 24hr experiment and a set of intensives.
- VLBA
- Data Quality Improvement Update
- Phase cals loading now due to a new HOPS build. Now getting phase cals and fringes.
- Gave refringed intensives data to Chris for analysis recently, update in the future on quality through solution.
- Chris: Will want to run cable cal analysis again once experimental databases are analyzed. Update in future.
- Daily Observation Report for December
- Wanted to bring up end of November and early December lack of fringes:
- Filelist bug not the problem (see November)
- Haven't been able to find X-band fringes on Jan 08 MK-PT observations. S-band appears normal but will continue to investigate
- Overall a good month, pretty quiet.
- Recorrelation of R4633
- The packs are still in Socorro
- Dave: USNO will get back to NRAO on vex file updates.
- 4 station observations
- Been doing every other week, one from 4 weeks ago is in USNO. Analysis expected in 2 weeks on 4344, 4328 may have problems as described below.
- F4344 was run on wrong DiFX version (not 5454) but was recorrelated on that. Dan had not been able to export a prior observation (F4328?).
- Open issues
- MK Visit in Early 2015 by USNO? Dave is look at Thursday afternoon, the 22nd around 1pm. ACTION NRAO: Ephraim to coordinate a time.
- Next meeting on February 12th.
--
EphraimFord - 2015-01-07