The Balancing Project has successfully been completed. Two new observing directives were created. These are BalanceOnOff() and ChangeAttenuation(). Two astrid ...
Calibration Project Charter Project Manager: Main.ToneyMinter Project Scientist: Main.JimBraatz Project Tracking Number: This should be obtained by GBT program...
A new project was started this quarter to impliment improved calibration methods for GBT observing and data reduction. The project team includes Toney Minter, Ji...
Ron and Toney have made progress in understanding vector calibration. A "new" method of calibration for frequency switched observations theoretically has the pos...
The team members meet this week to start planning out the work break down structure. Four paths of development were identified that can be worked on in parallel....
GBT Remote Observing Manual Make sure to email the GBT telescope operator (gbtops #64;gb.nrao.edu) theday before you are schedule to observe to let him that you w...
Balancing Using Astrid Directives Project Charter Version 1.0 Project Manager: Main.ToneyMinter Project Tracking Number: This should be obtained by GBT program...
Calibration Project Charter Project Manager: Main.ToneyMinter Project Scientist: Main.JimBraatz Project Tracking Number: This should be obtained by GBT program...
Calibration Project Charter Project Manager: Main.ToneyMinter Project Scientist: Main.JimBraatz Project Tracking Number: This should be obtained by GBT program...
GBT Remote Observing Manual Make sure to email the GBT telescope operator (gbtops #64;gb.nrao.edu) the day before you are schedule to observe to let him that you ...
Grail Development Notes 12/13/2006 Field Callback improvements Grail has been modified to improve the field level callback services. In addition to providing ca...
Instructions for GBT20A 451: Investigating the Ionized Gas of Orion and Taurus (Matteo Luisi, Will Armentrout, Toney Minter, Pedro Salas, Loren Anderson) Observi...
Observing Policies Group * Set GROUP = RichardPrestage, RonMaddalena, CarlBignell, KarenONeil, Main.ToneyMinter * Set ALLOWTOPICCHANGE = Main.ObservingPolic...
PF1 340 MHz Band Receiver Checkout on April 28, 2005 All switches, etc. were found to be working except the 40 MHz YRD filter. Plot of RFI across the band while p...
Proto MR for Limiting Scan Segment Parameter Feedback Modification Request #n (Q99 2099) 1. Introduction The GBT control system is based upon controllers or ma...
REU Observing Project 2008 Last Update: JeffMangum 19 Jun 2008 We have requested that the CV GB Summer Student observing time be scheduled during the period J...
REU Observing Project 2009 Last Update: JeffMangum 25 June 2009 The CV GB Summer Student observing time has been scheduled as follows: * 2009/07/05: 13:00 ...
REU Observing Project 2010 Last Update: JeffMangum 26 May 2010 The CV GB Summer Student observing time has been scheduled as follows: * 2010/07/04: 8:30 ...
REU Observing Project 2011 Last Update: JeffMangum 09 July 2011 The CV GB Summer Student observing time has been scheduled as follows: * 2011/07/08: 18:00 ...