2016 NRAO Charlottesville Summer Student Information Last Update: Main.JimBraatz June 17, 2016 Charlottesville Summer Student Calendar General Information Most...
2018 NRAO Charlottesville Summer Student Information General Information Useful links: * Charlottesville Summer Student Calendar * Main summer student page...
2015 NRAO Charlottesville Summer Student Information Last Update: Main.AlisonPeck 10 May 2015 Charlottesville Summer Student Calendar General Information Mos...
To confirm the calibration of the Amplifier Test System (ATS), noise figure and gain were measured with three test systems using calibrated noise sources on the s...
Beam measurments. Note that eta_pol is 100% because cross pol was not included in this data. Also note that eta_grand_tot for 274 GHz is clearly wrong. Freq (GHz...
ICD Verification From e mail from McLeod Wed 21 Jul 2010: The plan for this was to produce a unit test suite, consisting of hundreds of small tests each of which ...
Band 6 Optics Geometry, from TICRA report here, defines the following variables: using this geometry: and they provide the following parameters: The following dra...
Mixer Failure Cart 013 FEIC 2010 05 04 11:39 Pol 0, Mixer 2 (SN 130:159/160:046) failed in Cart B6.013 in NA FEIC with mixer drawing only 20uA (should be 100uA ) ...
Amplitude and Phase Repeatability Software Requirements Measurement Measurement proceedure is here. Additional parameters needed so analysis software can automa...
Software Audit On Site Meeting Thur 19 Jun 2009 Attended by: Jeff Siegel, Mike Rakolta, Main.MichaelLacasse, Deepika Nagaraj Joining in at 8:30am to discuss mee...
* New Parent Topic: Band6SwAudit Evolving Plan for Software Audit Ideas for draft Statement of Work Write nearly final draft of Statement of Work during visit t...