the NRAO Public Wiki

You are here: NRAO Public Wiki>KPAF Web>DirectorsOffice>EngPlanning>WorkBreakdownStructure (2007-08-27, StevenWhite) Edit wiki text Edit Attach Print version
-- StevenWhite - 07 Jun 2007
1. Overall System Design and Specification
1.1 Electrical Design
1.2 Mechanical Design

2. Single Pixel Design

2.1 Cold Design
2.2 Warm Design
2.3 Single Pixel Receiver Assembly
2.4 Monitor and Control
2.5 On-Sky Test

3. Multi-Pixel Design

3.1 Cold Design
3.2 Warm Design
3.3 Array Assembly
3.4 Observational Support Software
3.5 Data Pipeline Software
3.6 Commissioning
Edit  | Attach | Print version | History: r5 < r4 < r3 < r2 | Backlinks | View wiki text | Edit wiki text | More topic actions
Topic revision: r4 - 2007-08-27, StevenWhite
KPAF
  • keyLog In
  • addRegister

  • home KPAF Web
  • newtopic Create New Topic
  • index Index
  • searchtopic Search
  • changes Changes
  • notify Notifications
  • statistics Statistics
  • wrench Preferences


  • Webs
  •  ALMA
  •  NAASC
  •  SCIIPT
  •  CDL
  •  CICADA
  •  Ccs
  •  Littlethings
  •  Cville
  •  DSAA
  •  EVLA
  •  FASR
  •  HPC
  •  JVLA
  •  KPAF
  •  Library
  •  Main
  •  Metrics
  •  NGVLA
  •  NM
  •  Computing
  •  Electronics
  •  OSAA
  •  OSX
  •  SRDP
  •  Software
  •  Algorithms
  •  CASA
  •  Splat
  •  System
  •  VLBA

This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback