2010 June GBT KFPA Call for Proposals The K band Focal Plan Array Receiver (KFPA) was successfully commissioned in March and April 2010. Initial results of these...
2011 February GBT KFPA Call for Proposals The K band Focal Plan Array Receiver (KFPA) was successfully re commissioned in August and September 2010. Results of t...
2012A GBT Call for Proposals KFPA The K band Focal Plan Array Receiver (KFPA) share risk observations were successful in Winter 2010/2011. The KFPA is now av...
16: Mapping and Calibration: 2010 April 19 Ran tests of nodding spectra with all beams. Seemed OK. Ran some maps of TMC, Orion and M33, which looked reasonable....
Frequency Switched Pipeline Calibration Plan Note that much of the content of this documentation is out of date. Please refer to the GBT Pipeline documentation ...
Preparing to hoist with Ken Ward and Phillip Rittenhouse Photograph by Bob Simon GBT Turret view with Bob Goldizen, Harry Morton and Phillip Rittenhouse ...
Please feel free to edit this page and add any topics for discussion during this workshop. Eventually these items will be folded into the agenda. Visit the Main...
Main.StevenWhite 2013 02 28 An ongoing issue is the stability of the integrated noise calibration module,ICM. Occasionally the values are not loaded properly, a ...
Nyquist Sampling at K band * \text{Magnification is 3, giving f/D of 3 x 0.6 = 1.9.} * \text{ Nyquist sampling (Voltage) of focal plane FWHM spacing requir...
Kfpa Commissioning Session Report 29 and 30 Kevin Christiansen systematically reduced KFPA commissioning observations of W51 and produced spectral line plots and ...
KFPA Observation Summary; Organized by Source All the KFPA test observations are public domain, and may be used by any one. To make finding the KFPA observations...
KFPA Pipeline Development Note that much of the content of this documentation is out of date. Please refer to the GBT Pipeline documentation instead!!! This web...
KFPA Pipeline Calibration and Imaging Review NRAO will hold an internal review of the KFPA imaging pipeline on Thursday June 17, starting with the science lunch d...
KFPA and Pipeline Data Reduction Guide Note that much of the content of this documentation is out of date. Please refer to the GBT Pipeline documentation instea...
Kfpa Commissioning Session Report 17 Observations configured for larger scale images, to test pipeline processing. Had some setup issues during these tests, wh...
K Band Focal Plane Array (KFPA) and Pipeline Observer's Guide Note that much of the content of this documentation is out of date. Please refer to the GBT Pipeli...
Communications Problems * When the KFPA Cleo Manager display are all "1 's", the control software is not communicating with the net burner card and needs to ...
New Directions and Requirements for the GBT Pipeline Agenda: * Brief summary of current pipeline (Joe) 10 min * Top priority requirements (All Met) ...
Position Switched Pipeline Calibration Plan Note that much of the content of this documentation is out of date. Please refer to the GBT Pipeline documentation i...
KFPA Re commissioning Test Reports The KFPA was reworked during summer 2010 and restored to the GBT on August 21, 2010. Below we summarize the tests made to confi...
* External Committee Members * Internal Working Group * 2007 September (.pdf) * 2007 April (.pdf) * Exact frequency coverage of the front end. Is this o...
Seven Pixel K band Focal Plane Array Commissioning We present summaries of initial commissioning tests of the KFPA 7 pixel tests in March and April 2010. These te...
KFPA Re commissioning Test Reports The KFPA was completed and put on the antenna for pre observing tests on October 13, 2010. Below we summarize the tests made to...
KFPA hardware and software checks during "Shared Risk" observations TKFPA_40, December 15, 2010: Calibration check observations of 3C48 and the Moon Performed Da...
KFPA hardware and software tests TKFPA_75, August 31, 2011: Repeated Spectral line band scans for stability test * Nod observations while telescope stowed du...
KFPA Calibration and Test Observations, continuued KFPA calibration observations are presented for Autumn 2011. The primary calibration observations were made t...
Useful Old KFPA Links and Documentation * GBT K band Beam Spacing (Receiver Independent) * Actual KFPA Feed and Pointing Offsets * LNA and Receiver Noise...
KPAF Web Preferences The following settings are web preferences of the KPAF web. These preferences overwrite the site level preferences in . and , and can...