September 28th 2007 Focal Plane Array Discussion Meeting

Overview

The GBT is a superb telescope with excellent performance at frequencies up to 50 GHz (wavelength = 7mm). Demand for telescope time at the higher frequencies exceeds supply by a factor of > 5. All indications are that 90GHz (3mm) operation is well within our grasp. However, the telescope is still only equipped with single or dual-feed receivers, restricting its instantaneous sky coverage. Development of array receivers at a range of frequencies would truly revolutionize the capabilities of the telescope.

We propose two parallel paths to develop the focal plane array program, starting immediately:

  • Study the science drivers, explore technical options, develop collaborations with interested groups, and identify funding for a complete focal plane array development program. This would include ~100 pixel array receivers (nominally at K and W-band), a new, digital, IF transmission system, advanced Spectrometers, and full data analysis software.

  • In parallel, start work on a pathfinder 7-pixel K-band (18-26GHz) focal plane array, the necessary first step in the full program and a powerful scientific instrument in its own right. This array would initially be used with the existing GBT IF system and Spectrometer.

The goals of the 28th September 2007 meeting are to continue discussion of the science drivers for focal plane arrays on the GBT, and to review the arguments which lead us to propose K-band as the frequency for the pathfinder array. As an outcome of the meeting, we seek approval to initiate development of the K-band array.

Agenda

  • 09:00 – 09:15 Introduction (Richard Prestage)
  • 09:15 – 10:15 Science Drivers
    • General Overview (Jay Lockman)
    • W-band Science Drivers (Juergen Ott)
    • K-band Science Drivers (Juergen Ott)
  • 10:15 – 10:30 Break
  • 10:30 – 11:00 Technical considerations for an FPA Program (Steve White)
  • 11:00 – 11:30 The K-band FPA Proposal (Matt Morgan)
  • 11:30 – noon General Discussion, Summary

Material

Topic attachments
I Attachment ActionSorted ascending Size Date Who Comment
FPADevelopmentProgramSDW.pdfpdf FPADevelopmentProgramSDW.pdf manage 686 K 2007-09-26 - 08:34 RichardPrestage PDF version of powerpoint
FPADevelopmentProgramSDW.pptppt FPADevelopmentProgramSDW.ppt manage 637 K 2007-09-26 - 08:29 RichardPrestage  
KFPA_FINAL_24Sept-1.pdfpdf KFPA_FINAL_24Sept-1.pdf manage 331 K 2007-09-25 - 08:11 RichardPrestage  
KFPA_FINAL_24Sept.pdfpdf KFPA_FINAL_24Sept.pdf manage 275 K 2007-09-26 - 13:49 StevenWhite  
KbandScienceLong.pdfpdf KbandScienceLong.pdf manage 480 K 2007-09-25 - 08:11 RichardPrestage  
Morgan_KFPA.pdfpdf Morgan_KFPA.pdf manage 364 K 2007-09-26 - 08:35 RichardPrestage PDF version of powerpoint
Morgan_KFPA.pptppt Morgan_KFPA.ppt manage 336 K 2007-09-26 - 08:24 MatthewMorgan  
PurposeAgenda28Sep07.pdfpdf PurposeAgenda28Sep07.pdf manage 72 K 2007-09-26 - 08:37 RichardPrestage  
case_GBT_3mm_FPA_final_Ott.pdfpdf case_GBT_3mm_FPA_final_Ott.pdf manage 180 K 2007-09-25 - 08:12 RichardPrestage  
Topic revision: r9 - 2009-10-19, CarolynWhite
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback