--
BobSimon - 2010-08-25
Changes/Fixes to be made in hardware and software:
Misc control screen:
Should look like:
Cryo LNA control screen:
Add beam label in the drain voltage and drain current box.
Cryo LNA monitor screen:
Add beam label in the drain voltage and drain current box.
IDM Monitor screen:
Swap type 1 block with type 2 block. This will put the beam numbers in order.
Misc monitor screen:
Common block diagram for all seven beams:
Add filter ranges
Add legal attenuator ranges
Add valid LO1 and LO2 ranges
Common sampler screen:
Add one more cryo monitor. Should be 8 monitor fields. Labels to be deterimined.
Fix dewar and pump vacuum monitors. Appears to be a scaling problem.
Put power supply monitors in different order, and separate from the cryo temp monitor boxes.