Main.BobSimon 2010 08 25 Changes/Fixes to be made in hardware and software: Misc control screen: Should look like: * CalControl.pdf Cryo LNA control screen:...
Final Report: kfpa_cdr_finalreport2.pdf: February 11, 2009 Final Response: KFPA Critical Design Review Response.pdf :February 26, 2009. Dates: January 30 and 31...
!Engineering Planning Table of Contents Seven Pixel Tests * Post Commissioning Tests * Commissioning Stability Tests March 26 and April 19, 2010: 800 MHz...
A seven feed, dual polarized K band focal plane array receiver is proposed for the Green Bank Telescope. This instrument will enhance the scientific capabilities ...
Nyquist Sampling at K band * \text{Magnification is 3, giving f/D of 3 x 0.6 = 1.9.} * \text{ Nyquist sampling (Voltage) of focal plane FWHM spacing requir...