The creation of a Manager and microcontroller firmware is the first step and handles the hardware M&C functionality
GBT System Integration
Introduction of the KFPA Manager into the M&C system is trivially accomplished via configuration files. Additional work is required for full integration as a common user instrument
Changes to the Measurements Manager
Possible changes to the Measurements Manager and receiver calibration database schema
Changes to the IF Manager
Modification of the IF Manager to properly simulate the IF path between receiver and backend
Changes to CLEO
Integration into the Engineers & Operator’s GUI (CLEO)
GBT Observing Integration
Changes to the Configuration API
Modification of the Configuration API
Changes to the Balance API
Modification of the Balance API
Changes to the Observation API
Possible changes to the Observation API used by observers when writing Scheduling Blocks for observing