Casa Parallelization meeting minutes: Monday 3 June 2013

Attendees: Jeff

Review of Priorities:

  • Benchmarking the pipeline
    • Two tasks:
      • DONE Install pipeline for James use
      • DONE Instrument pipeline for metrics
  • Removal of Scratch Columns:
    • CalLibrary: 4.2 cycle Progressing

Completed Targets

  • Kumar: MMS and Model Column CAS-3584
  • Justo / Sandra: msTransform (including retiling)

Progress on Current Development Targets

  • Kumar: Tile Size for Temp Lattice
    • Code is changed in active (default is at least 1 MB)
    • Should we change this, to something bigger? Not yet in the toolkit.
      • Kumar will change to allow this to be specified
  • Kumar: Grid Threading and load balancing: break up into many smaller pieces then can thread across all available cores.
    • Still looking at processing improvement, why is this not improving linearly... to investigate.
    • Needs to be scheduled for work.
    • ALERT! Jeff to open a Jira to track this
  • Jim: Time averaging and BL dependent averaging
    • Design in process
  • Compressed storage manager, needs to be tested.
    • Starting with filler

Benchmarking / Profiling

Results

Requests

  • IO Profile of ALMA pipeline
    • Blocked waiting on larger data set
  • Tile size performance measurements
    • Waiting for Kumar to expose parameters
  • Testing of compressed storage manager

AOB

  • UVA:
-- JeffKern - 2013-06-03
Topic revision: r2 - 2013-06-03, JeffKern
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.