You are here:
NRAO Public Wiki
>
HPC Web
>
CasaParallelization
>
CasaParallelMinutes20100813
(2010-08-20,
JamesRobnett
)
Edit
w
iki text
Edit
Attach
P
rint version
Casa Parallelization meeting minutes
Friday August 13
Attendees:
Kumar Golap, Sanjay Bhatnagar, Brian Glendenning, James Robnett
Targets/tasks for August 13-20
Time domain partitioning in continuum imaging
Kumar
Enable multiple MSes per imaging process
Kumar
Examine Multiscale-clean performance issue in object copy
Sanjay
Implement proto-parallel calibration task
Sanjay
(full version to be assigned)
Further Lustre testing
James
Create CASA parallelization priority list
James/Bryan/Brian
Understand planning for time segregation of filler and MS independent calibration
Brian
Look into status of M. Caillat and parallel filler (Bryan or Brian ?)
Check on multi-ms viewer
Sanjay
stalled till Ger gets back
Discussion
Further Lustre testing
James
Not really possible to fully test, client bound
Initial results are positive, much lower latency as expected
Still capped at around 2.1 GB/s aggregate through put
Create description for calibration from one MS to another
Bryan
Ticket identified, not sure if it's been forwarded on
New target
begin working on calibration independent of MS *
Sanjay
may work on separate proof of concept version to advance state of the art.
Needed to advance split MSes
Time domain partitioning in continuum imaging
Kumar
Started but slightly sidetracked to revisit some channel based issues
Desired to make I/O more efficient
Minor debugging of current frequency based continuum imaging
Kumar
Inefficiency when a nodes image channel spans two spectral windows
Potential bug if #channels is not integer divisible by number of cores
Examine Multiscale-clean performance issue
Sanjay
Non-urgent FFT process spends 75% of time in object copy
35% in summation of images as I += I(s), potentially solveable with I = I + I(0) + I(1) ... I(n)
Interactive masking now works
Create CASA parallelization priority list
James/Bryan/Brian
7 Antennas at high site, by October should have 10'ish ALMA antennas
Mosaic'ing for both EVLA and ALMA
Want end-to-end processing filler, flagging, calibration, imaging, plots
Brian
Understand planning for time segregation of filler and MS independent calibration
I/O manager draft
James
Need Continuum imaging processes to support multiple MSes
Kumar will look into the above, James will look into implementing a simple I/O manager
Check on multi-ms viewer
Sanjay
stalled till Ger gets back
Potential need for scheduler by early to mid-september
--
JamesRobnett
- 2010-08-20
E
dit
|
A
ttach
|
P
rint version
|
H
istory
: r1
|
B
acklinks
|
V
iew wiki text
|
Edit
w
iki text
|
M
ore topic actions
Topic revision: r1 - 2010-08-20,
JamesRobnett
HPC
Log In
Register
HPC Web
Create New Topic
Index
Search
Changes
Notifications
Statistics
Preferences
Webs
ALMA
NAASC
SCIIPT
CDL
CICADA
Ccs
Littlethings
Cville
DSAA
EVLA
FASR
HPC
JVLA
KPAF
Library
Main
Metrics
NGVLA
NM
Computing
Electronics
OSAA
OSX
SRDP
Software
Algorithms
CASA
Splat
System
VLBA
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki?
Send feedback