Children of EVLACommissioning in EVLA Web

Results from EVLA web retrieved at 09:13 (Local)

2010DConfiguration
2010 D Configuration * OSRO Readiness Tasks * OSRO Proposals Readiness Cycle 1 (protected) * RSRO Proposals Readiness Cycle 1 * Tracking Sheet for EVL...
NEW - 2010-09-20 - 10:29 by jmcmulli
2010DnC,CConfiguration
2010 DnC and C Configurations * 2010C RSRO Status Main.JosephMcMullin 20 Sep 2010
2011AConfiguration
2011 RSRO/ECSO Status for A Configuration Project Band(s) Test Code Test Status Allocation Status Notes JIRA ECSO ...
2011CnB,BConfiguration
2011 CnB, B, BnA Configuration Status * 2011B RSRO Status Main.JosephMcMullin 20 Sep 2010
2011D,DnCConfiguration
RSRO/ECSO Status for 2011 D Config, CBE makeup in progress Project Band(s) Test Code Science SBs * *Science Time Notes JIRA ...
2012AConfiguration
RSRO/ECSO Status for 2012 A Configuration Project Band(s) Test Code Science SBs Science Time Notes JIRA ECSO 12B 002 CXKu T...
2012BConfiguration
RSRO/ECSO Status for 2012 B Configuration Project Band(s) Test Code Science SBs Science Time Notes JIRA ECSO 12A 041 KaQ ...
2012CConfiguration
RSRO/ECSO Status for 2012 C Configuration UPDATED 2apr12 Project Band(s) Test Code Science SBs * *Science Time Notes JIRA ECSO ...
2013DConfiguration
SRO/RSRO/VCSO Status for 2013 D, DnC, C Configurations (Shared Risk Observing)/(Resident Shared Risk Observing)/(VLA Commissioning Staff Observing) Project Ba...
CommissioningTaskLeaderGuide
# Commissioning Task Leader Guide ## Commissioning Target Plan Each high level commissioning target represents required core functionality (linked to the EVLA pr...
r3 - 2010-02-22 - 18:53 by jmcmulli
DataQuickLookTools
Data Quick Look Tools These tools exploit the TelCal solutions for the calibrator data as well as other monitoring data (e.g., weather). The data is available dur...
NEW - 2010-09-28 - 10:21 by jmcmulli
DataReviewGuide
Data Review Guide Data Review Elements to include for problem reporting * Antenna(s) antennas (or baselines) on which the issue is seen. * Band(s) seen...
ECSVDailyLog
ECSV Daily Log 2011 October 21 Oct (Weekend) Hi folks Lots of testing on various fronts (3 bit, RSRO, holography, gain linearity). Some progress even! but no...
ECSVMeetings
EVLA Commissioning and Science Verification Meetings 2013 * 01 ECSVmeeting 8jan13.pdf: VLA Commissioning Science Verification Discussion 8jan13 the final ...
EVLACommissioningOrganization
EVLA Commissioning Organization Goal Bring the EVLA into full operation at the end of 2012, offering the maximum possible range of capabilities to the user commu...
EVLADemoScience
EVLA Demo Science D configuration (2011 makeup) Project Status Time Comments SB M87 Ready 6/6 Ka: 0830 1030; 6hours TDEM0...
EVLAObservingBandCheckouts
EVLA Observing Band Checkouts * P Band Status: Testing * Antennas with no P band Rx: 7, 16, 22, 24 (no feed); 1, 4, 5 Rxs are not working. * L Band S...
r2 - 2010-06-02 - 12:38 by jmcmulli
EVLASoftwareVersioning
EVLA Software Versioning Goal * At minimum to understand (at all times) the current version of all of the constituent software/firmware components involved in...
EVLASystemVerification
EVLA System Verification Antenna Status Area Requirement Test Blind pointing at 8 GHz The rms blind pointing under good weather conditi...
NEW - 2010-03-24 - 13:59 by jmcmulli
EcsvMailList
ecsv list * adeller * amiodusz * bbutler * bclark * bglenden * bhesman * cbrogan * ccarilli * cchandler * cwalker * dfrail * e...
NEW - 2010-02-26 - 11:52 by jmcmulli
KeyToCalcodes
calcodes are generated based on observing intents established during the SB creation. These intents are then passed along to the SDM data set. These are summarize...
KraussPipelineMonitoring
Krauss Pipeline Monitoring * 11May11 * 13May11 * 13May11 Main.JosephMcMullin 2011 05 09
RSROCalendar
RSRO Calendar 2013 NameProject(s)JanFebMarAprMayJunJulAugSepOctNovDecDatesRoomPhonePOCRSRO Plan End Summary Enno Middelberg VLBA 1 8 2...
RSROObservingPreparationGuidelines
RSRO Observing Preparation Guidelines Updated 02 Dec 2010: aim at general RSRO rather than just high frequencies. Updated 03 Apr 2010: remove need for bracketing ...
Real-timeMonitoringWithD10
Real time Monitoring with d10 Where /home/mchost/evla/bin/d10 How * d10 1 2 will show all available products for the baseline EA01 EA02, and will plot the co...
ResidentSharedRiskObserverGuide
Resident Shared Risk Observer Guide Introduction The RSRO program offers participants early access to the growing capabilities of the EVLA as it is being commiss...
r2 - 2010-06-16 - 13:12 by jmcmulli
ScienceDataModelResourcesAndDocumentation
Science Data Model Resources and Documentation SDM V1.1 The "missing tables" section simply lists a few major glaring omissions. I am working on proposals for ...
TestObservationSchedulingCodes
Test Observation Project Codes Critical Commissioning Tests System Verification Observations * TCOR: Correlator observations (no data in the archive looks li...
TestObservationSubmission
Test Observation Submission/Tracking Joan Wrobel Michael Rupen * Discuss the desired observations at the 1330 Monday Commissioning meeting. * Consult t...
r4 - 2010-03-17 - 17:31 by jwrobel
UnderstandingTheSchedulingPriorityAlgorithm
Understanding the Scheduling Priority Algorithm New (OST version 1.09 (03Jun11)) Scheduling Priorities Every SchedulingBlock can have component priority rating...
Number of topics: 30
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback