Overall status: B configuration; 4-band dipoles deployed. Correlator hw resources support up to 64 BlBprs (that many sub-bands or use for additional resolution). Stable software system; move begins next week. 11B cycle disposition letters 31 May; next call for proposals 1 Jul.
Hardware status and updates (Langley, Perley, Rupen)
Array (Perley/Langley):
EA18 out until 23 May.
WIDAR (Rupen):
Notes (Rupen/Sowinski): Ongoing focus on 3-bit samplers (report Langley/Dhawan); able to do 64 BlB pairs (two boards need repair/replacement but not affecting data).
CBE looking good; pushing ahead on subarrays; CM work to fix an issue recovering from stress/pointing files; CRM delayed to this week (pending adequate testing time). OPT 1.09 testing under webtest is ongoing.
CASA Update (new functionality available/issues/enhancements):Notes (Miriam): Stable deployed last Friday; release pending.
AIPS Update (new functionality available/issues/enhancements): Notes (Eric):
NOTE: Please cc me on submitted tests so that it can be assigned the appropriate priority!
Commissioning priorities for the week (McMullin, Chandler)
Single maintenance day week:
Mon
1100-1700 Testing
1800-0900(Tues) Science operations and testing
Tue:
0900-1700 Testing/software development time
1800-0630: Science operations and testing
Wed: Maintenance day
0630-1700: Maintenance operations
1800-0900: Science operations and testing
Thu:
0900-1700: Testing/software development time
1800-0900: Science operations and testing
Fri (holiday):
Science observing and testing
Sat-Sun
Science operations + planned testing
Issues Affecting Science Observing:
Correlator: [Pokorny/Rupen/McMullin] time mislabeling in SDM data (non-synchronous operation between correlator dumps and CBE can require additional 1/2 integration time padding for online flags).
Correlator: [Clark/Carlson] Delay rocking across bands. Implementation pending factor-of-2 reconciliation.
Array: [Gustaaf] Amplitude wobbles seen on subset of antennas; phase jumps at scan boundaries also seen on subset of antennas (Ka, Q bands only thus far).
Array: [All] Zoo of other effects (some data are very good, some still seeing antenna-based IF/Polarization issue).
Testing This week
3-bit samplers (Dhawan+): statistics and noise testing (highest priority)
Spectral Line (Linz/Ott): Spectral dynamic range test (TSPE0010.3923557). Submitted.
Spectral Line (Goss/Chomiuk): BP stability/repeatability (TSPE0005.3699117). Submitted..Completed. Report pending.
Correlator: Rupen: S-band shadow testing; Delayed until Michael's return.
Correlator: *; L-band SEFD confirmation
We present sensitivity measurements of the EVLA at L-band between 0.95 and 2 GHz. These are obtained using three EVLA antennas that are equipped with the final, EVLA-compliant L-band receivers. The reported SEFD values meet and/or exceed the EVLA sensitivity requirements over about 70% of the band, but are too high by 12-38% over the frequency range 1425-1750 MHz.
Correlator: Durand/McMullin/Pokorny/Butler; review of CRC error events (may involve testing).
Spectral line: Momjian: HI High resolution bandpass testing