2011 RSRO/ECSO Status for A Configuration

Project Band(s) Test Code Test Status Allocation Status Notes JIRA
ECSO       A: 110/144    
11A-126 C - Complete 16/16 Perley  
11A-129 L - Complete 30/30 Sjouwerman  
11A-137 K - Ready
2000-2330
6/18 Sjouwerman;14.4 MB/s peak  
11A-231 SC TRSR0037 Complete 28/28 [16] Momjian; 6.4 MB/s peak  
11A-235 CKKa - Complete 24/24 Hofstadter  
10C-222 CQ - Ready
1400-1700
1330-1500
9/21 Chandler  
11A-278 C - Complete 10/10 Owen  
11A-291 L - Complete 4/4 Momjian  
RSRO       A: 205/280.5    
10A-231/AC982 KaQ TRSR0002 Ready 59/110.5 [18.5] Chandler; 14.4 MB/s peak RSRO-4
10A-196/AL746 CKa TRSR0008 Ready 34.5/47 [3] Leroy; 14.4 MB/s peak RSRO-7
10B-124 CK TRSR0022 Complete 72/72 [12] Hofner RSRO-26
11A-150 K TRSR0036 Pending testing 64 Blb+8x recirc 0/9 Liu  
11A-188 CKQ - Complete 8/8 Melis; 14.4 MB/s peak Not resident
11A-216 C TRSR0039 Complete 24/24 Neff; 14.4 MB/s peak  
11A-220 CKaQ - Complete 4/4 Takahashi  
11A-239 CKa - Ready 15.0/21.5 [4] Sokoloski; 14.4 MB/s peak  
11A-142 L TRSR0038 Ready-by hand 62/80 [7] Hughes  
SC0489 C - Complete 10/10 Heinke  
11A-275 L - Complete 3/3 Deller  
11A-294 LC - Complete 1/1 Rosen  
RSRO/ECSO Active Transient            
10B-218 Miller-Jones
10C-145 Berger
11A-253 Berger
11A-254 Chomiuk
11A-258 Cenko
11A-262 Zauderer
11A-263 Sokoloski
11A-266 Zauderer
11A-277 Soderberg
11A-280 Roy
11B-217 Soderberg
-- JoanWrobel - 2011-08-25
Topic revision: r28 - 2011-09-05, JosephMcMullin
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback