TGBT15A_915_79 Test New PFB Core for c0800x0512 Pulsar Mode Goals Ryan discovered artifacts in coherent VEGAS pulsar mode data taken as part of astrophysical acc...
TGBT15A_915_72 testing RAMPS / KEYSTONE configurations Goals * Try and understand the IF configuration for these projects Details * Start at 9:15am. *...
TGBT15A_915_71 VPM Raw Mode Testing Goals * Test VPM Raw mode by looking at bright pulsar B1937 21 Details * Start around 1:15pm * Select L band to be ...
TGBT15A_912_70 Continued Mode 1,2,22 release /VPM branch testing Continued from Nov 8 Goals * Repeat the release modes with all eight banks * Tests the ...
TGBT15A_915_69 Mode 1,2,22 release branch testing Goals * Check stability of released versions of modes 1,2,22 Details * Plan to use X band; it may not be...
TGBT15A_915_62 continued balance testing See CICADAGreenBankSpectrometer2016Sep07 Details: * 11:00am Justin switches to new version. Start again at mode...
TGBT15A_915_61 Spectral line balancing in VPM branch Goals * Run the CheckModeN scripts in TGBT15A_915 in the new branch, and the released branch * Check u...
VEGAS To Do List This page was forked from VegasOldToDoList on 23rd September 2015. Go to that page for historical information Current VEGAS Spikes (Complete by...
Configurable Instrument Collaboration for Agile Data Acquisition: Next generation backends for Pulsar Timing (shortcut to GUPPI), Spectroscopy and Transient Event...
Running GUPPI With Astrid This page describes the status of observing with GUPPI using Astrid as of 21 Sept 2009 (the initial release). Executive Summary With th...
VEGAS Pulsar Mode Scale Factors This is a record of scale factors that give reasonably good output values in the VEGAS bandpass (i.e., the average bandpass is aro...
Summary of Switching Signal Tests Initial Tests with New Manager Justin and Ryan tried testing an updated version of the manager with additions to the Backends c...
TGBT14A_912_140 check of latest build of modes 4 6 Goals * Try out latest build of Modes 4 6 Details "Before" tests with current BOF. * Get logged in at ...
CICADA/VEGAS Project Team Meetings 2015 Meetings November 23, 2015 Team Meeting November 02, 2015 Team Meeting October 19, 2015 Team Meeting October 05, 2015...
VEGAS / DIBAS Potential Upgrades OTF Mapping Problem Ray Git Repository Jason IF Modules Galen * Split dual channel modules into single channel modules to i...
TGBT14A_912_138 Run a series of scans in L band and Q band to test the low power in VEGAS Bank B pol 0. The first set of scans were in L band, but due to RFI (o...
Detailed Notes for Tests of Medium Priority VEGAS Pulsar Modes List all tests, their status, and notes for each mode Coherent Modes 100 MHz BW/32 Channels 100 ...
Detailed Notes for Tests of High Priority VEGAS Pulsar Modes List all tests, their status, and notes for each mode Coherent Modes 200 MHz BW/128 Channels 800 M...
TGBT14A_912_135 Test new analog IF modules in Banks A and B Goals * what the title says Details Analog IF tests * Delays due to an angry IF manager * ...
TGBT14A_912_134 Test new analog IF modules in Banks E and F, C band config tests Goals * what the title says Details Analog IF tests * 1pm set up. C band...
VEGAS Hardware Tests 2015 Sep 23 Session Goals Ray suggested a new bitmask for guppi_threads.conf to bind certain guppi_daq processes to particular cores. The ...
VEGAS Hardware Tests 2015 Sep 22 Session Goals 1 Investigate source of incorrect sub integration times on certain banks 1 Investigate switching signal co...
Vegas Pulsar Commissioning Tests Notes on how to test pulsar observing modes for the VEGAS backend system. Recent Changes * Added basic instructions for runni...
VEGAS Old To Do List This page is obsolete, and is for historical information only. For the new list, go to VegasToDoList Updated 14th September 2015 RMP/MAB F...
TGBT14A_912_130 Test new analog IF modules in Banks C and D Goals * what the title says Details * 1pm set up. Takes 40 mins to get right versions of softw...
VEGAS: VErsatile GBT Astronomical Spectrometer Analog IF Interface Control Updated August 18, 2015: New IIc control scheme described. Description The VEGAS I...
TGBT14A_912_128 Mode 4 6 config tool tests Goals * Check the new center frequency calculations in config tool are correct. Details * 1pm Melinda and Joe...
TGBT14A_912_125 look for spikes with FPGA digital noise source / RRL C band configuration Goals * We are still trying to track down the source of the non Fs/6...
TGBT14A_912_120 Testing New Analog IF box from Galen (inserted into Bank D) Overview A new analog filter block was inserted and hooked up to Bank D. Tonight I wi...
TPTCS14A_912_121 test RRL Groups C band script Goals execute C band observing script from AGBT14B_431, and check C band system temps Details * Copy script to...
Update on the VEGAS spur issue, August 2015 Background In analyzing RFI scans taken with VEGAS Ron Maddalena noticed 'rails' of spikes (hereafter spurs to differ...
TGBT14A _912_116 Overview Joe and Adam are testing the most up to date BOF files, which should have almost all fixes in place (bi modal behaviour, shifted center...
VEGAS Pulsar Modes Manager 1. Introduction The VEGAS Pulsar Modes Manager (still called the VEGAS Manager) is an adaptation of the previously existing VEGAS Mana...
TGBT14A_912_105 bump tests on noise source Goals * Repeat bump tests on noise source Details * Set up at 6:30pm. * Noise source is connected to bank G....
TGBT14A_912_103 VEGAS Bump Tests Goals * Repeat overnight bump tests Details * Start setting up at 7:00pm * IF Manager is complaining about Bank H ju...
TGBT14A_912_101 gain long integrations to get low noise snap block data Setup * Scans 1 3 Get the system setup so that Jason can get Spectral Analyzer data ...