100 recent changes in CICADA Web retrieved at 19:38 (Local)

CICADAGreenBankSpectrometer2017oct05
TGBT15A_915_126 Coherent Pulsar Mode Troubleshooting Goals * During tests last week the coherent pulsar modes were not running because of an incorrect MAC address ...
CICADAGreenBankSpectrometerCommissioningLogs
Commissioning Logs This webpage logs the commissioning tests for VEGAS. Remaining Issues * See VegasToDoList Test Logs ProjectID Session Who Details ...
CICADAGreenBankSpectrometer2017oct03
TGBT15A_915_125 Check Spectral Line Configuration and Balancing Goals * During tests last week we noticed that Banks E H were not properly balanced in one polarization ...
CICADAGreenBankSpectrometer2017sep28
TGBT15A_915_123 Check Balancing in Pulsar and Spectral Line Modes Goals * In previous tests, VEGAS does not independently balance when used in dual backend mode ...
VegasPulsarProjectMeeting2017Oct02
VEGAS Pulsar Project Meeting Sprint Review: 2017 October 2nd 14:00 15:00pm ET Present * Ryan, Jason, Laura, Joe, Ray Sprint Story Overview * VE 320: Fix ...
VegasPulsarProjectMeetings2017
VEGAS Pulsar Project Meetings Minutes under the JIRA project framework (beginning 2017). * 2017 October 02 Sprint Planning * 2017 October 02 Sprint Review ...
CICADAGreenBankSpectrometer2017sep28a
TGBT15A_915_124 Tests of Spectral Line balancing Goals * Run X band Modes 1 29, check balance Details * Get started around 3pm New manager, new HPC ...
CICADAGreenBankSpectrometer2017sep22
TGBT15A_915_103 More fftshift and scale tests for incoherent modes Goals * In previous tests, VEGAS does not independently balance when used in dual backend mode ...
VegasPulsarProjectMeeting2017Sep18
VEGAS Pulsar Project Meeting Sprint Review: 2017 September 18th 14:00 15:00pm ET Present * Ryan, Jason, Richard, Ray, Joe, Mark Sprint Story Overview ...
CICADAGreenBankSpectrometer2017sep13
TGBT15A_915_121 Continued spectral line regression tests Goals * Continued tests of new manager, new HPC software, with some config_tool fixes\ Details * Get ...
VegasPulsarProjectMeeting2017Aug30
VEGAS Pulsar Project Meeting Sprint Review: 2017 August 30th 11:00 12:00am ET Present * Laura, Joe, Mark, Ray, Richard, Luke, Randy Sprint Story Overview ...
RegTestAnalysis
Spectral Line Regression Test Analysis July / August 2017 My scripts, results, et. in /users/rprestag/vegas/regression TGBT15A_915_120 (evening of Wed 30th ET) ...
CICADAGreenBankSpectrometer2017aug30
TGBT15A_915_120 More regression tests Goals * Continued attempts at regression testing. This time, the subreflector is not working, but everything else seems to ...
CICADAGreenBankSpectrometer2017aug28
TGBT15A_915_117 "Before" "astronomical" regression tests Goals * Run "before" and "after" regression tests with configurations which match popular observation ...
VegasPulsarProjectMeeting2017Aug14
VEGAS Pulsar Project Meeting Sprint Review: 2017 August 14th 2:00 3:00pm ET Present * Laura, Jason, Ray, Ryan, Natalia Sprint Story Overview * VE 292: ...
CICADAGreenBankSpectrometer2017aug10
TGBT15A_915_112 check released version is reinstalled correctly Details * 3:30pm log in * 3:40pm run RunRegressLSP with 10 sec integrations * Antenna Manager ...
CICADAGreenBankSpectrometer2017aug09
TGBT15A_915_111 Continued "New Manager" spectral line regression tests, but this time with classic and matrix HPC software Goals * Continue testing new spectral ...
CICADAGreenBankSpectrometer2017aug03
TGBT15A_915_110 Continued "New Manager, new HPC" spectral line regression tests Goals * Continue testing new spectral line modes Details * 10:30am testing ...
CICADAGreenBankSpectrometer2017aug02
TGBT15A_915_109 Continued "New Manager, new HPC" spectral line regression tests Goals * Continue testing new spectral line modes Details * 10:00 11:45am ...
CICADAGreenBankSpectrometer2017aug01
TGBT15A_915_108 L band drift scans for RET teachers Put your content here, and don't forget to sign!
VegasPulsarProjectMeeting2017Jul31
VEGAS Pulsar Project Meeting Sprint Review: 2017 July 31st 2:00 3:00pm ET Present * Luke, Ray, Richard, Mark, Ryan, Sprint Story Overview * VE 292: Investigate ...
CICADAGreenBankSpectrometer2017Jul26
TGBT15A_915_106 Continued "New Manager, New HPC software" spectral line tests Goals Continue regression testing while telescope is parked at access Details * ...
CICADAGreenBankSpectrometer2017Jul25
TGBT15A _915_105 Testing of "new manager, new HPC" software Goals: * Run through all modes with VEGAS, L band TP and SP, X band TP only Details * 7pm to ...
CICADAGreenBankSpectrometer2017Jul27
GBT15A_915_107 check old version has been re released successfully Details * 11:30am. Log in and run runRegressLSP * Run scans 1 and 2, then abort and change ...
CICADAGreenBankSpectrometer2017Jul20
TGBT15A_915_103 More fftshift and scale tests for incoherent modes Goals * I previously tried to find good values of vegas.scale for an fftshift value of 0x5555555f ...
CICADAGreenBankSpectrometer2017Jul19
TGBT15A_915_102 Test 32 channel pulsar modes Goals * The i1500x0032 mode appears to be shifted in frequency from the expected center of the bandpass. The goal ...
VegasPulsarProjectMeeting2017Jul17
VEGAS Pulsar Project Meeting Sprint Review: 2017 July 17th 2:00 3:00pm ET Present * Laura, Jason, Randy, Joe Sprint Story Overview * VE 276: Connect 10Gb ...
VegasPulsarProjectMeeting2017Jul05
VEGAS Pulsar Project Meeting Sprint Review: 2017 July 5th 2:00 3:00pm ET Present * Laura, Joe, Ryan, Jason, Luke, Randy, Ryan Sprint Story Overview * VE ...
CICADAGreenBankSpectrometer2017Jul13
TGBT15A_915_101 Detailed fftshift and scale tests for incoherent modes Goals * Find best combination of fftshift and vegas.scale to eliminate/minimize FFT overflow ...
GUPPISupportGuide
GUPPI Support Guide Introduction GUPPI is the Green Bank Ultimate Pulsar Processing Instrument, the backend system used for nearly all pulsar observing at the GBT ...
CICADAGreenBankSpectrometer2017Jul06
TGBT15A_915_100 Detailed fftshift and scale tests for incoherent modes Goals * Find best combination of fftshift and vegas.scale to eliminate/minimize FFT overflow ...
VegasPulsarProjectMeeting2017Jun19
VEGAS Pulsar Project Meeting Sprint Review: 2017 June 19th 2:00 3:00pm ET Present * Laura, Joe, Ryan, Jason, Luke, Randy, Ryan Sprint Story Overview * ...
VegasPulsarObservingInstructions
Pulsar observers should now request to use VEGAS in pulsar modes. A detailed description of VEGAS's planned pulsar capabilities an be found in the GBT Proposal Guide ...
CICADAGreenBankSpectrometer2017Jun29
TGBT15A_915_99 Detailed fftshift and scale tests for incoherent modes Goals * Find best combination of fftshift and vegas.scale to eliminate/minimize FFT overflow ...
CICADAGreenBankSpectrometer2017Jun28
TGBT15A_915_98 Test Improved BOF Files Goals * Test new 32 channel BOF files and BOF files for other bandwidth and mode combinations with 24 tap, 0.95 bin width ...
VegasPulsarBofFileStatus
VEGAS Pulsar BOF File Status This page describes the status of the VEGAS Pulsar Mode bof files. The naming convention for the mode names (and bof files) is encoded ...
VegasPulsarProjectMeeting2017Jun05
VEGAS Pulsar Project Meeting Sprint Review: 2017 June 5th 2:00 3:00pm ET Present * Laura, Joe, Ryan Sprint Story Overview * VE 242: Continue work on coherent ...
VegasPulsarProjectMeeting2017May01
VEGAS Pulsar Project Meeting Sprint Review: 2017 May 1st 2:00 3:00pm ET Present * Laura, Jason, Mark, Joe, Ryan, Natalia Sprint Story Overview * VE 226 ...
VegasPulsarProjectMeeting2017Apr17
VEGAS Pulsar Project Meeting Sprint Review: 2017 April 17th 2:00 3:00pm ET Present * Jason, Joe, Richard, Randy, Ryan Sprint Story Overview * VE 214: Continue ...
VegasPulsarMCReleaseNotes
VEGAS Pulsar Modes M C Release Notes Released during TBD. New Features and Improvements for VPM Release M C System * VEGAS * The VEGAS Manager and Coordinator ...
VegasPulsarProjectMeeting2017Apr03
VEGAS Pulsar Project Meeting Sprint Review: 2017 April 3rd 2:00 3:00pm ET Present * Ryan, Jason, Joe, Ray, Natalia, Randy Sprint Story Overview * VE 204 ...
VegasPulsarProjectMeeting2017Mar06
VEGAS Pulsar Project Meeting Sprint Review: 2017 March 6th 2:00 3:00pm ET Present * Laura, Richard, Ray, Joe, Ryan, Natalia, Jason Sprint Story Overview ...
VegasPulsarProjectMeeting2017Mar20
VEGAS Pulsar Project Meeting Sprint Review: 2017 March 20th 2:00 3:00pm ET Present * Richard, Mark, Jason, Joe, Ryan, Natalia, Laura, Ray Sprint Story Overview ...
CICADAGreenBankSpectrometer2017Mar29
TGBT15A_915_94 Test performance of VEGAS without ADC calibration Goals * Determine the impact of not applying OGP, INL, and MMCM calibration to VEGAS spectral ...
CICADAGreenBankSpectrometer2017Mar22b
TGBT15A_915_92 (cont.) Test Stokes U and V with new VEGAS bof file Goals * Test behavior of Stokes U and V data with a new BOF file that uses registers in place ...
CICADAGreenBankSpectrometer2017Mar17
TGBT15A_915_91 Test fftshift values for various BOF files Goals * Use a DIBAS style BOF file with VEGAS to see if Stokes U/V phase wraps are still present. Details ...
CICADAGreenBankSpectrometer2017Mar22
TGBT15A_915_92 Test Stokes U and V with new VEGAS bof file Goals * Test behavior of Stokes U and V data with a new BOF file that uses registers in place of delay ...
CICADAGreenBankSpectrometer2017Mar07
TGBT15A_915_90 Test fftshift values i0800x0512 and obtain ADC snap blocks Goals * Test different values of fftshift for the i0800x0512 BOF file and obtain some ...
CICADAGreenBankSpectrometer2017Feb28
TGBT15A_915_89 Test fftshift values for various BOF files Goals * Test different values of fftshift for different BOFs to see which eliminate overflow and artifacts ...
VegasPulsarProjectMeeting2017Feb21
VEGAS Pulsar Project Meeting Sprint Review: 2017 February 21st 2:00 3:00pm ET Present * Joe, Randy, Laura, Ryan Sprint Story Overview * VE 175: Troubleshoot ...
CICADAGreenBankSpectrometer2017Feb17
TGBT15A_915_88 Test for FFT Overflow and Source of Artifacts Goals * Test for FFT overflow using a new BOF file provided by Randy and Jason (c0800x0512_fft_ovf ...
VegasPulsarProjectMeeting2017Feb09
VEGAS Project Meeting Test Environment Review: 2017 February 9th 10:00 11:00am ET Present * Ryan, Randy, Laura, Jason, Joe, Ray, Richard Purpose Make sure ...
VegasPulsarProjectMeeting2017Feb06
VEGAS Pulsar Project Meeting Sprint Review: 2017 February 6th 2:00 3:00pm ET Present * Ryan, Joe, Ray, Richard, Natalia, Laura Sprint Story Overview * ...
CICADAGreenBankSpectrometer2017Feb08
TGBT15A_915_87 Investigate Coherent Pulsar Mode Artifacts. Goals Ryan discovered artifacts in coherent VEGAS pulsar mode data taken as part of astrophysical acceptance ...
VegasPulsarProjectMeeting2017Jan27
VEGAS Pulsar Project Meeting Impromptu Meeting: 2017 January 27th 2:00 3:00pm ET Present Ryan, Joe, Steve, Jason, Randy, Natalia Overview During acceptance ...
VegasPulsarProjectMeeting2017Jan23
VEGAS Pulsar Project Meeting Sprint Planning: 2017 January 23rd 2:00 3:00pm ET Present * Ryan, Laura, Joe, Ray, Natalia, Jason, Randy, Richard Backlog 11 ...
VegasPulsarModes
VEGAS Pulsar Modes Overview This project will support the development, testing, integration and commissioning of a set of pulsar modes (which are a superset of the ...
CICADAGreenBankSpectrometer2017Jan25
TGBT15A_915_79 Test New PFB Core for c0800x0512 Pulsar Mode Goals Ryan discovered artifacts in coherent VEGAS pulsar mode data taken as part of astrophysical acceptance ...
CICADAGreenBankSpectrometer2017Jan18
TGBT16B_510_01 Mode 1,2,22 BTL branch testing Goals * Test VEGAS spectral line modes with Breakthrough Listen software branch * Using scripts identical to ...
VegasPulsarProjectMeeting2017Jan20
VEGAS Pulsar Project Meeting Sprint Review: 2017 January 20th 2:00 3:00pm ET Present * Ryan, Jason, Joe Sprint Story Overview * VE 152: HBW coherent mode ...
CICADAGreenBankSpectrometer2016Nov15
TGBT15A_915_72 testing RAMPS / KEYSTONE configurations Goals * Try and understand the IF configuration for these projects Details * Start at 9:15am. * ...
CICADAGreenBankSpectrometer2016Nov10a
TGBT15A_915_71 VPM Raw Mode Testing Goals * Test VPM Raw mode by looking at bright pulsar B1937 21 Details * Start around 1:15pm * Select L band to be in ...
CICADAGreenBankSpectrometer2016Nov10
TGBT15A_912_70 Continued Mode 1,2,22 release /VPM branch testing Continued from Nov 8 Goals * Repeat the release modes with all eight banks * Tests the VPM ...
CICADAGreenBankSpectrometer2016Nov08
TGBT15A_915_69 Mode 1,2,22 release branch testing Goals * Check stability of released versions of modes 1,2,22 Details * Plan to use X band; it may not be ...
CICADAGreenBankSpectrometer2016Sep08
TGBT15A_915_62 continued balance testing See CICADAGreenBankSpectrometer2016Sep07 Details: * 11:00am Justin switches to new version. Start again at mode ...
CICADAGreenBankSpectrometer2016Sep07
TGBT15A_915_61 Spectral line balancing in VPM branch Goals * Run the CheckModeN scripts in TGBT15A_915 in the new branch, and the released branch * Check using ...
VegasToDoList
VEGAS To Do List This page was forked from VegasOldToDoList on 23rd September 2015. Go to that page for historical information Current VEGAS Spikes (Complete by ...
VegasPulsarProjectMeeting2016Jul11
VEGAS Pulsar Project Meeting: 2016 May 16th 2:30 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2016Jun13
VEGAS Pulsar Project Meeting: 2016 May 16th 2:30 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeetings
VEGAS Pulsar Project Meetings * 2016 July 11 * 2016 June 13 * 2016 June 6 * 2016 May 30 No Meeting * 2016 May 23 No Meeting * 2016 May 16 No ...
WebHome
Configurable Instrument Collaboration for Agile Data Acquisition: Next generation backends for Pulsar Timing (shortcut to GUPPI), Spectroscopy and Transient Event ...
VegasPulsarProjectMeeting2016Jun06
VEGAS Pulsar Project Meeting: 2016 May 16th 2:30 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
GUPPIAstridGuide
Running GUPPI With Astrid This page describes the status of observing with GUPPI using Astrid as of 21 Sept 2009 (the initial release). Executive Summary With the ...
VegasPulsarProjectMeeting2016May09
VEGAS Pulsar Project Meeting: 2016 May 9th 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2016May02
VEGAS Pulsar Project Meeting: 2016 May 2nd 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2016Apr25
VEGAS Pulsar Project Meeting: 2016 April 25th 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2016Apr18
VEGAS Pulsar Project Meeting: 2016 April 18th 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2016Apr04
VEGAS Pulsar Project Meeting: 2016 April 4th 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2016Mar28
VEGAS Pulsar Project Meeting: 2016 March 21st 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2016Mar21
VEGAS Pulsar Project Meeting: 2016 March 21st 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2016Feb29
VEGAS Pulsar Project Meeting: 2016 February 29th 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2016Feb22
VEGAS Pulsar Project Meeting: 2016 February 22nd 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2016Feb08
VEGAS Pulsar Project Meeting: 2016 February 8th 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2016Feb01
VEGAS Pulsar Project Meeting: 2016 February 1st 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarScales
VEGAS Pulsar Mode Scale Factors This is a record of scale factors that give reasonably good output values in the VEGAS bandpass (i.e., the average bandpass is around ...
VegasPulsarProjectMeeting2016Jan25
VEGAS Pulsar Project Meeting: 2016 January 25th 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2016Jan11
VEGAS Pulsar Project Meeting: 2016 January 11th 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarProjectMeeting2015Dec28
VEGAS Pulsar Project Meeting: 2015 December 28th 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
CICADAGreenBankSpectrometer2015Dec17
TGBT14A_912_141 Check Modes 4 6 BOF file again Goals * Test version 137 of L1/LBW1 BOF l1_ver137_1500_511_fir_2015_Dec_10_1529.bof Details * Start setting ...
VegasPulsarProjectMeeting2015Dec14
VEGAS Pulsar Project Meeting: 2015 December 14th 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
CICADAGreenBankSpectrometer2015Dec10
TGBT14A_912_141 Check Modes 4 6 BOF file again Goals * Test version 136 of L1/LBW1 BOF Details * Start setting up at 8:00am * Start with X band * Run ...
VegasPulsarProjectMeeting2015Dec07
VEGAS Pulsar Project Meeting: 2015 December 7th 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasPulsarSwitching
Summary of Switching Signal Tests Initial Tests with New Manager Justin and Ryan tried testing an updated version of the manager with additions to the Backends class ...
VegasPulsarProjectMeeting2015Nov30
VEGAS Pulsar Project Meeting: 2015 November 23rd 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
CICADAGreenBankSpectrometer2015Nov24
TGBT14A_912_140 check of latest build of modes 4 6 Goals * Try out latest build of Modes 4 6 Details "Before" tests with current BOF. * Get logged in at 8am ...
VEGASTeamMeeting23November2015
VEGAS Team Meeting GB 137 hub 192.33.117.12##7144 434 817 6443# (telephone) Attendees: Mark, Randy, Jason, Richard, Ray, Joe, Marty, John, Dave Agenda: ...
VegasPulsarProjectMeeting2015Nov23
VEGAS Pulsar Project Meeting: 2015 November 23rd 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
CICADAVegasProjectMeetings
CICADA/VEGAS Project Team Meetings 2015 Meetings November 23, 2015 Team Meeting November 02, 2015 Team Meeting October 19, 2015 Team Meeting October 05, 2015 ...
VegasPulsarProjectMeeting2015Nov09
VEGAS Pulsar Project Meeting: 2015 November 9th 2:00 3:00pm ET Room / Connection Details * GB 137 / Soc 280 * 192.33.117.12##7144 * 434 817 6443 Housekeeping ...
VegasDibasPotentialUpgrades
VEGAS / DIBAS Potential Upgrades OTF Mapping Problem Ray Git Repository Jason IF Modules Galen * Split dual channel modules into single channel modules to improve ...
Number of topics: 100

See also: rss-small RSS feed, recent changes with 50, 100, 200, 500, 1000 topics, all changes
Topic revision: r3 - 2009-10-19, CarolynWhite
 

This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback