Detailed Notes for Tests of Medium Priority VEGAS Pulsar Modes List all tests, their status, and notes for each mode Coherent Modes 100 MHz BW/32 Channels 100 ...
Detailed Notes for Tests of High Priority VEGAS Pulsar Modes List all tests, their status, and notes for each mode Coherent Modes 200 MHz BW/128 Channels 800 M...
TGBT14A_912_135 Test new analog IF modules in Banks A and B Goals * what the title says Details Analog IF tests * Delays due to an angry IF manager * ...
TGBT14A_912_134 Test new analog IF modules in Banks E and F, C band config tests Goals * what the title says Details Analog IF tests * 1pm set up. C band...
VEGAS Hardware Tests 2015 Sep 23 Session Goals Ray suggested a new bitmask for guppi_threads.conf to bind certain guppi_daq processes to particular cores. The ...
VEGAS Hardware Tests 2015 Sep 22 Session Goals 1 Investigate source of incorrect sub integration times on certain banks 1 Investigate switching signal co...
Vegas Pulsar Commissioning Tests Notes on how to test pulsar observing modes for the VEGAS backend system. Recent Changes * Added basic instructions for runni...
VEGAS Old To Do List This page is obsolete, and is for historical information only. For the new list, go to VegasToDoList Updated 14th September 2015 RMP/MAB F...
TGBT14A_912_130 Test new analog IF modules in Banks C and D Goals * what the title says Details * 1pm set up. Takes 40 mins to get right versions of softw...
VEGAS: VErsatile GBT Astronomical Spectrometer Analog IF Interface Control Updated August 18, 2015: New IIc control scheme described. Description The VEGAS I...
TGBT14A_912_128 Mode 4 6 config tool tests Goals * Check the new center frequency calculations in config tool are correct. Details * 1pm Melinda and Joe...
TGBT14A_912_125 look for spikes with FPGA digital noise source / RRL C band configuration Goals * We are still trying to track down the source of the non Fs/6...
TGBT14A_912_120 Testing New Analog IF box from Galen (inserted into Bank D) Overview A new analog filter block was inserted and hooked up to Bank D. Tonight I wi...
TPTCS14A_912_121 test RRL Groups C band script Goals execute C band observing script from AGBT14B_431, and check C band system temps Details * Copy script to...
Update on the VEGAS spur issue, August 2015 Background In analyzing RFI scans taken with VEGAS Ron Maddalena noticed 'rails' of spikes (hereafter spurs to differ...
TGBT14A _912_116 Overview Joe and Adam are testing the most up to date BOF files, which should have almost all fixes in place (bi modal behaviour, shifted center...
VEGAS Pulsar Modes Manager 1. Introduction The VEGAS Pulsar Modes Manager (still called the VEGAS Manager) is an adaptation of the previously existing VEGAS Mana...
TGBT14A_912_105 bump tests on noise source Goals * Repeat bump tests on noise source Details * Set up at 6:30pm. * Noise source is connected to bank G....
TGBT14A_912_103 VEGAS Bump Tests Goals * Repeat overnight bump tests Details * Start setting up at 7:00pm * IF Manager is complaining about Bank H ju...
TGBT14A_912_101 gain long integrations to get low noise snap block data Setup * Scans 1 3 Get the system setup so that Jason can get Spectral Analyzer data ...