TGBT15A_915_79 Test New PFB Core for c0800x0512 Pulsar Mode Goals Ryan discovered artifacts in coherent VEGAS pulsar mode data taken as part of astrophysical acc...
TGBT15A_915_72 testing RAMPS / KEYSTONE configurations Goals * Try and understand the IF configuration for these projects Details * Start at 9:15am. *...
TGBT15A_915_71 VPM Raw Mode Testing Goals * Test VPM Raw mode by looking at bright pulsar B1937 21 Details * Start around 1:15pm * Select L band to be ...
TGBT15A_912_70 Continued Mode 1,2,22 release /VPM branch testing Continued from Nov 8 Goals * Repeat the release modes with all eight banks * Tests the ...
TGBT15A_915_69 Mode 1,2,22 release branch testing Goals * Check stability of released versions of modes 1,2,22 Details * Plan to use X band; it may not be...
TGBT15A_915_62 continued balance testing See CICADAGreenBankSpectrometer2016Sep07 Details: * 11:00am Justin switches to new version. Start again at mode...
TGBT15A_915_61 Spectral line balancing in VPM branch Goals * Run the CheckModeN scripts in TGBT15A_915 in the new branch, and the released branch * Check u...
VEGAS To Do List This page was forked from VegasOldToDoList on 23rd September 2015. Go to that page for historical information Current VEGAS Spikes (Complete by...
Configurable Instrument Collaboration for Agile Data Acquisition: Next generation backends for Pulsar Timing (shortcut to GUPPI), Spectroscopy and Transient Event...
Running GUPPI With Astrid This page describes the status of observing with GUPPI using Astrid as of 21 Sept 2009 (the initial release). Executive Summary With th...
VEGAS Pulsar Mode Scale Factors This is a record of scale factors that give reasonably good output values in the VEGAS bandpass (i.e., the average bandpass is aro...
Summary of Switching Signal Tests Initial Tests with New Manager Justin and Ryan tried testing an updated version of the manager with additions to the Backends c...
TGBT14A_912_140 check of latest build of modes 4 6 Goals * Try out latest build of Modes 4 6 Details "Before" tests with current BOF. * Get logged in at ...
CICADA/VEGAS Project Team Meetings 2015 Meetings November 23, 2015 Team Meeting November 02, 2015 Team Meeting October 19, 2015 Team Meeting October 05, 2015...
VEGAS / DIBAS Potential Upgrades OTF Mapping Problem Ray Git Repository Jason IF Modules Galen * Split dual channel modules into single channel modules to i...
TGBT14A_912_138 Run a series of scans in L band and Q band to test the low power in VEGAS Bank B pol 0. The first set of scans were in L band, but due to RFI (o...