VE-242: Continue work on coherent 32-channnel BOF files (COMPLETE)
VE-243: Update existing BOF files with delay registers and wrap behavior improvements (IN PROGRESS)
VE-244: ADC calibration for vegasr2-2 (COMPLETE?)
VE-245: Complete testing of GUPPI monitor on devenv-hpc1 (INCOMPLETE)
VE-246: Continue work on Matrix manager (IN PROGRESS)
VE-241: PFB for low bandwidth modes (IN PROGRESS)
VE-247: Developer testing of release candidate (IN PROGRESS)
VE-230: High time resolution modes (IN PROGRESS)
Story Details
VE-242: Continue work on coherent 32-channnel BOF files
Jason and Randy passed along files to Ryan for testing. Ryan needs to track down a system with a dealer/player or M&C installation suitable for testing. Perhaps install dibas code on reg_test.
VE-243: Update existing BOF files with delay registers and wrap behavior improvements
Luke is actively working on this but Ryan has not received a list of updated BOF files yet.
VE-244: ADC calibration for vegasr2-2
We believe this is complete but need to check with Jason. We are unsure which ROACH2 was being worked on. It would make more sense if this was devenvr2-2.
VE-245: Complete testing of GUPPI monitor on devenv-hpc1
Ryan was able to get as far as starting guppi_daq_server but the data stream did not seem to be formatted as expected.
VE-246: Continue work on Matrix-Manager Interface
Nearing completion. This encompasses an interface between the Manager and either vegas_hpc/guppi_daq and the Matrix.
VE-241: PFB for low bandwidth modes
Still working on data format issues in eight subband modes, and ensuring that integration times are calculated as expected. Joe hopes to complete testing by Monday.
VE-247: Developer testing of release candidate
Still in shake down
VE-230: High time resolution modes
Natalia has analyzed some test data taken on the noise diode and believes the data looked good.
VEGAS Pulsar Project Meeting - Sprint Planning: 2017 June 5th 2:00 - 3:00pm ET
Note: The team's "velocity" has been consistent at 11--13 points per sprint. We should aim for 12 points per sprint for planning purposes.
Backlog
Prepare a release candidate for the re-based VPM branch that can run spectral line modes as expected
Spectral line regression tests of release candidate
Various Matrix work
Critical Issues
M&C system and regression tests
New Stories
VE-222: Upgrade postprocessing scripts for multibank data