Baseline ringing (high frequency noise) in VEGAS data
VEGAS Blanking fix and impacts
Test Time
Other
Meeting notes:
Any updates on the updated OG(P) calibration
regular communications with UCB - new code for calibration scheme due from Dave McMahon
No progress last week on spur detection MR
Last bits of the MR in progress
Integration time MR
To be tested Thursday
What does that mean to the blanking time tables in the observer's guide?
Should be minimal, is wider for for frequency switching No changes needed
At some point the actual values need to be reconciled with the "rounded values" currently used
bandwidths are ok
Adam will take a look at it this week
Mode 10-19 hardware fix
Software fix is ready to test
Baseline ringing (high frequency noise) in VEGAS data
Okay on insertion of attenuators (Thursday)
VEGAS Blanking fix and impacts
To be tested Thursday
Test Time
Tuesday
[no power]
Thursday (4-5 hours reserved)
Integration time MR
Install attenuators (1st)
Mode 10-19 hardware fix
To be tested Thursday
Other
Should we add a separate register to allow gain adjustment of each "polarization" (channels)? A common tuning frequency is okay. Randy to investigate in consultation w/UCB (Hong). Wait to see what happens in practice before making a change.