VEGAS Team Meeting
Attendees: Amanda, Anish, Paul, Joe, Marty, Richard, Mark, Randy, Dan, John, Hong
Agenda:
- OGP calibration; status of ADC calibration in general
- Usage of MMCM in low bandwidth mode
- ADC calibration routines and documentation for DIBAS
- Mode 10-19 (ghost frequencies issue)
- Blanking of last switched integration
- Status of Manager writes to many sub-bands in 8 subband mode problem (release and test)
- Content of August 'release'
- Use of test time (including overnights)
- Status of other current issues: https://safe.nrao.edu/wiki/bin/view/CICADA/CICADAGreenBankSpectrometerCurrentIssues
- Resource plan for Q4 FY2015
Meeting notes:
- OGP calibration; status of ADC calibration in general
- we are basically done
- the MR has been signed by the sponsor (Jason Ray)
- Not an effect on August release
- Usage of MMCM in low bandwidth mode: VEGAS, unfortunately, has some modes which clock the ADC at very low sample rates, which forces us to use low bandwidth mode
- there is still the issue about this fundamental flaw with the MMCM calibrations occasionally failing: we discussed at the end of the last meeting ways we could get around this, but I haven't heard any more details on it and I don't have any action items to follow through on. Right now our Manager expects that these measurements will occasionally fail.
- ADC calibration routines and documentation for DIBAS
- we are putting the finishing touches on the docs intended for DIBAS
- Mode 10-19 (ghost frequencies issue)
- Randy looking at bof files
- Joe on GPU with time series snapshots - working on issue with extraction routine
- real and ghost spectra are sometimes swapped
- Anish looking at data from above
- Blanking of last switched integration
- Status of Manager writes to many sub-bands in 8 subband mode problem (release and test)
- Use of test time (including overnights)
- Unscheduled request(s)
- Tuesday
- 13:00 - 15:00 mixed mode testing and checking vegas exposure time with LO1 switching [Roshi]
- Wednesday
- Thursday
- 8:00am 12pm; Streaming Data Display tests [Kepley/Brandt]
- Status of other current issues: https://safe.nrao.edu/wiki/bin/view/CICADA/CICADAGreenBankSpectrometerCurrentIssues
Other
- Please make sure to properly code your timesheets for the current time period and going forward.
- Software engineers should be using a GBT ops software CM&E account - Account 893252
- Electronic engineers should be using a GBT ops electronics CM&E account - Account 432510
- Commissioning activities should be getting charged to hardware support and testing - Account 432510
- Scientists assisting with shared-risk commissioning should be charging an observer support account
- 432540 for the most part. Accounts 142020 (GB-based staff) and 142010 (CV-based staff) for when you are helping with overarching observing support (not problem solving, VEGAS specific)
--
MartyBloss - 2014-06-23