VEGAS Team Meeting
Attendees: Ray, Jason, Mark, Richard, Paul, Randy, Glenn, Anish, Marty, Dan
Agenda:
- mode 1/2 ripples and AGBT14A-437 shared risk report
- ADC Calibration
- Review of Jim Braatz velocity/frequency issues (ideally needs Anish, Amanda, Melinda, Jim Braatz, Bob Garwood)
- Review of Bob Garwood KFPA side-band problem. Is this fixed? How do we test it?
- Richard will contact Bob for clarification
- 1. Status of blanking time / mixed mode implementation
- Status of other current issues: https://safe.nrao.edu/wiki/bin/view/CICADA/CICADAGreenBankSpectrometerCurrentIssues
- Status of shared-risk astronomical observations: https://safe.nrao.edu/wiki/bin/view/CICADA/CICADAGreenBankSpectrometerAstronomicalObservations
- Plans for testing for this week.
Meeting notes:
- mode 1/2 ripples and AGBT14A-437 shared risk report
- particularly DURATION < INTEGRAT issue (Mode #4).
- Needs Joe and the new switching signals in place to complete
- ADC Calibration
- simply loading files does not reduce noise - needs additional step
- Reprogram the roach works so there may be extra steps need to recalibrate the ADCs with bof loads
- on hold to complete after resolution of above - has a manager implication
- Review of Jim Braatz velocity/frequency issues (ideally needs Anish, Amanda, Melinda, Jim Braatz, Bob Garwood)
- Melinda needs to release a fix that Anish has evaluated
- CRVAL issue resolved
- Review of Bob Garwood KFPA side-band problem. Is this fixed? How do we test it?
- Needs GBT mantenance/test time
- Status of blanking time / mixed mode implementation
- May be delayed by as much as two weeks by unplanned LO-1 work taking key resource
- Richard will draft an astronomical/user requirement for desired config tool behavior
- Status of other current issues: https://safe.nrao.edu/wiki/bin/view/CICADA/CICADAGreenBankSpectrometerCurrentIssues
- Status of shared-risk astronomical observations: https://safe.nrao.edu/wiki/bin/view/CICADA/CICADAGreenBankSpectrometerAstronomicalObservations
- Plans for testing for this week.
- Dependent o LO-1 work
- Can do some bank testing (Creager)
- items to test when GBT becomes available
- mode 1 testing
- KFPA sideband issues
- Streaming testing
- Tests Joe needs
- Patch Melinda's code and re-run Jim's test
Other
- Please make sure to properly code your timesheets for the current time period and going forward.
- Software engineers should be using a GBT ops software CM&E account
Account 893252
- Electronic engineers should be using a GBT ops electronics CM&E account
Account 432510
- Commissioning activities should be getting charged to hardware support and testing (432510)
Account 432510
- scientists assisting with shared-risk commissioning should be charging an observer support account.
432540 for the most part. Accounts 142023 (GB-based staff) and 142013 (CV-based staff) for when you are helping with overarching observing support (not problem solving, VEGAS specific)
--
MartyBloss - 2014-05-05