Formal memo summarizing the results (and that these meet the specifications).
John will plan to do a talk abouty VEGAS at the CASPER workshop.
Mode #2 Testing:
One of the 1 hr long file with 10 msec integration there a utc jump in Bank B. This looks like a missing data. I think this test need to be repeated with the new HPC m/cs
Should retest with the new BOFs
Freq axis in GBTIDL is not correct. This is a software issue.
Other items:
Next Teleconference: August 12, 2013 .
-- MartyBloss - 2013-08-05