TGBT15A_915_106 - Continued "New Manager, New HPC software" spectral line tests
Goals
Details
Scans
CLEO Message Analysis (Time are 27th July UT)
Summary
Goals
Continue regression testing while telescope is parked at access
Details
Beamformer guys hand over around 10:30pm
Set up:
RunRegressLSP - frequency switching (Tracks), 120 sec duration
RunRegressLTP - total power (Tracks), 120 secs duration
RunRegressXTP - On/Offs - 120 secs on, 120 secs off
Leave running with Amber
Scans
Scans 1 - 29: start at 02:54UT L-Band Switched Power Modes 1-29. So they all seemed to run ok, but 2-7,13,17,19,20, 26 did not fill
Scans 30 - 58: start at 04:15UT L-band Total Power. Again, all seemed to run, but 13 of 29 scans didn't fill
Scans 59 - 116: start at 05:39UT X-band On/Offs, all ran, all didn't fill
Scans 117 - 145: start at 08:17UT : L-band switched power, all ran, all didn't fill
Scans 146 - 174: start 09:36UT L-band Total Power, all ran, all didn't fill *Finish at 10:54UT
CLEO Message Analysis (Time are 27th July UT)
From the CLEO Analyze Messages application, there were bursts of VEGAS message assertion / clears at:
03:15:53
03:18:31
04:38:53
06:26:47
08:40:13
10:00:42
It
seems
all of the scans ran for all banks, as far as I can tell, so it doesn't seem there were any aborts.
But, these messages seem to imply Banks were turned off, which doesn't quite make sense if they obtained data
Summary
See
CICADAGreenBankSpectrometer2017Jul25
--
RichardPrestage
- 2017-07-27
This topic: CICADA
>
WebHome
>
GreenBankSpectrometer
>
CICADAGreenBankSpectrometerCommissioningLogs
>
CICADAGreenBankSpectrometer2017Jul26
Topic revision:
2017-07-27,
RichardPrestage
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki?
Send feedback