TGBT15A_915_106 - Continued "New Manager, New HPC software" spectral line tests

Goals

Continue regression testing while telescope is parked at access

Details

  • Beamformer guys hand over around 10:30pm
  • Set up:
    • RunRegressLSP - frequency switching (Tracks), 120 sec duration
    • RunRegressLTP - total power (Tracks), 120 secs duration
    • RunRegressXTP - On/Offs - 120 secs on, 120 secs off
  • Leave running with Amber

Scans

  • Scans 1 - 29: start at 02:54UT L-Band Switched Power Modes 1-29. So they all seemed to run ok, but 2-7,13,17,19,20, 26 did not fill
  • Scans 30 - 58: start at 04:15UT L-band Total Power. Again, all seemed to run, but 13 of 29 scans didn't fill
  • Scans 59 - 116: start at 05:39UT X-band On/Offs, all ran, all didn't fill
  • Scans 117 - 145: start at 08:17UT : L-band switched power, all ran, all didn't fill
  • Scans 146 - 174: start 09:36UT L-band Total Power, all ran, all didn't fill *Finish at 10:54UT

CLEO Message Analysis (Time are 27th July UT)

  • From the CLEO Analyze Messages application, there were bursts of VEGAS message assertion / clears at:
    • 03:15:53
    • 03:18:31
    • 04:38:53
    • 06:26:47
    • 08:40:13
    • 10:00:42

  • It seems all of the scans ran for all banks, as far as I can tell, so it doesn't seem there were any aborts.
  • But, these messages seem to imply Banks were turned off, which doesn't quite make sense if they obtained data

Summary

-- RichardPrestage - 2017-07-27

This topic: CICADA > WebHome > GreenBankSpectrometer > CICADAGreenBankSpectrometerCommissioningLogs > CICADAGreenBankSpectrometer2017Jul26
Topic revision: 2017-07-27, RichardPrestage
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback