TGBT15A_915_69 - Mode 1,2,22 release branch testing
Goals
Details
Goals
Check stability of released versions of modes 1,2,22
Details
Plan to use X-band; it may not be in position right now, since they are swapping receivers
Turns out they also need LO and IF system for receiver checkout, may need to wait until they are done
Create script CheckMode1_rmp. Sets up for total power with cal, 6sec integrations, 1 min scans,
OnOff
Scans 1-10 - quick check,
not sure of receiver location.
Baselines look horrible, but assume that this is because they are working in the cabin. Wait until they are finished.
Scans 11-12: 10:45am - Amanda reports other work complete. Perform one test
OnOff
Look better, although still a big spike of something at 9.35 GHz
Scans 13 - 72: One hour of
OnOffs
.
CheckMode2_rmp
Scans 73 - 132: One hour of
OnOffs
Finish at 1:15pm
--
RichardPrestage
- 2016-11-08
This topic: CICADA
>
WebHome
>
GreenBankSpectrometer
>
CICADAGreenBankSpectrometerCommissioningLogs
>
CICADAGreenBankSpectrometer2016Nov08
Topic revision:
2016-11-08,
RichardPrestage
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki?
Send feedback