VEGAS Testing TGBT13B_502_42

Goals

  • Train Dan, Donna and Paul Marganian
  • Bank A configuration checks for Melinda

Details

  • Did the training. Ran scan 41 to demo GBTIDL, etc
  • Ran KFPAMode20OnOff1Beams1Spws in TGBT13B_502. Scans 42-45. That selected Bank E for the actual observation. Bank A seemed to activate and configure correctly, but then did not participate in the scan. The data file looks like the cal was switching, and only has data from Bank E. There was no problem in loading the mode. *The one concern I have is that at the end of the configuration, the config tool generates the following warning message:
[14:23:01]  Warning: Configuration complete but inconsistencies were found between the M&C system and the configuration tool. Verify the configuration 
[14:23:01] (manager,    parameter,   expected value,  actual value )
[14:23:01] ('VEGAS', 'subsystemSelect,BankAMgr', '1', '0')
  • Maybe we can get that message suppressed?
Topic revision: r2 - 2015-01-27, RichardPrestage
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback