DIBAS testing

Goal

On-sky testing with X-band and L-band to check and make sure that we get signal.

Details

* TGBT14A_902_03



# Scan      Time      Mode     Notes
# ------------------------------------------------------------
1      21:51:43   1   Aborted
2      21:54:12   1   Aborted
3      21:55:22   1   Aborted
4      22:03:55   1   W3 On
5      22:06:19   1   W3 Off
# Rebalanced converter rack to get DIBAS levels at ~18 dB.
6           22:12:46   1   W3 On
7      22:15:11   1   W3 Off
# accidently put line on edge of band. moved to center of band.
8      22:25:39   1   W3 On
9      22:28:04   1   W3 Off
10      22:36:16   20   W3 On
11      22:37:41   20   W3 Off
# Trying longer integration
12      22:43:39   20   W3 On
13      22:49:05   20   W3 Off
14      22:57:32   29   W3 On
15      23:03:03   29   W3 Off
16      23:15:06   10   U2855 On
17      23:17:46   10   U2855 Off
# Trying longer integration
18      23:21:41   10   U2855 On   
19      23:27:19   10   U2855 Off
20      23:34:40   9   U2855 On
21      23:40:18   9    U2855 Off
22      23:48:55   1   3C147 continuum
23      23:51:23   1   3C147 continuum
# Switching to VEGAS to see if mode 1 looks any better
24      00:00:35   1   3C147 continuum
25      00:03:04   1   3C147 continuum

-- AmandaKepley - 2014-02-07
Topic revision: r1 - 2014-02-07, AmandaKepley
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.