Topics

  1. Old Business
  2. New Business under Discussion.

Discussion Items

  • NAASC (Jewell)
    • New ASAC vicechair/ANASAC chair (John). ASAC Chair: Nagayoshi Ohashi, Eu Vice Chair E. Schinnerer. Should ASAC and ANASAC NA leaders be the same person? Separate ANASAC Chair?
    • Observations
      • Long Baseline Campaign SV data released, four science papers being prepared on LBC data by ALMA / ARC staff:
      • Paper #1 - An Overview Of The 2014 ALMA Long Baseline Campaign (lead: Ed Fomalont)
      • Paper #2 - ALMA Long Baseline Campaign Observations Of The Proto-Planetary Disk HL Tau (lead: Crystal Brogan)
      • Paper #3 - ALMA Long Baseline Observations Of The Minor Planet Juno At 60 Km Resolution (lead: Todd Hunter)
      • Paper #4 - ALMA Long Baseline Campaign Observations Of The Strongly Lensed Submillimeter Galaxy SDP.81 at z=3.04 (lead: Catherine Vlahakis)
      • two of these submitted last week; last two this week
    • ES Observing to resume 31 March
    • With Dec-Jan observing efficiency, ALMA should observe most A+B projects in Cy2, except those for which configuration will no longer be available
      • Science Portal news item being readied with details.
  • ALMA Board Meeting at JAO 11-13 March 2015
    • UC / ANASAC telecon held on 23 Feb 2015. Agenda topics (mostly concerning NRAO NA facility operations):
      • proposal submission glitches for 15A
      • rate at which CASA improvements/bug fixes is occurring, i.e., there is a perception that no CASA issues are being addresse
      • double jeopardy in joint NRAO-Swift proposals, in which a time allocation from NRAO still necessitates a funding proposal to Swift
      • update on ngVLA planning/technology development
      • update on GBT and VLBA status
    • Next face-to-face UC meeting 20-22 May Green Bank
      • 20 May is the ANASAC meeting day prior to the general meeting
  • Positions Open
    • The JAO is seeking an Observatory Scientist.
    • NAASC science positions (1 tenure track, ~2 scientist) in search / down-selection phase
  1. Program Scientist (Wootten)
  2. Science Operations (Lonsdale)
    • ES hiatus Feb/Mar for annual software/hardware upgrades.
    • ALMA Status Report was posted to SP on Nov 12, and broadcast to NA community
      • Includes configuration schedule, observing statistics, remaining observing pressure as function of LST, config & Band, EOC summary
    • Cycle 3 planning:
      • pre-announcement posted to SP on Dec 8 and broadcast to registered NA users.
      • Call/Deadline in Mar/Apr next year; panel meetings June in Japan; observing starts Oct1. 12mo cycle, so will be close to yearly cadence
      • Cycle 3 proto-capabilities (TBC): 36 antennas, longer baselines (frequency dependent). SG limitations will persist (5 tunings, 150ptg, 10deg limits per SG)
    • Cycle 1&2 Data Reduction update (Mar 2):
      • All Projects
        • Cycle 1: 198 HP projects in total. 145 (73%) with some SBs finished, 137 (69%) with some data delivered; 69 (35%) completely delivered.
        • Cycle 2: 354 HP projects in total. 161 (45%) with some SBs finished, 108 (31%) with some data delivered; 27 (8%) completely delivered.
      • NA Projects
        • Cycle 1: 97 HP projects in total. 51 (53%) with some SBs finished, 51 (53%) with some data delivered; 30 (31%) completely delivered.
        • Cycle 2: 118 HP projects in total. 57 (48%) with some SBs finished, 39 (33%) with some data delivered; 14 (12%) completely delivered.
        • Our goal is to get all non-problematic completed NA OUS to PIs prior to Cycle 3 deadline. Currently: 22 being reduced; 41 in queue.
    • Support to JAO: E. Fomalont & A. Remijan (long term EOC support)
  3. Astronomer Outreach
  4. Date of next meeting
    • 7 May 2015 (TBC)
    • Proposed dates for 2015 telecons: 2 Mar, 7 May, 2 Jul, 3 Sep, 5 Nov. Comments please.
  5. Other Business

Science Corner

  1. Memos and papers of note
  2. Press Releases
  3. ALMA Papers (choose ALMA)

Events of Interest

2015
 
 
 
 
 
16 March 2015
 
Call for ALMA/NA Development Study Proposals
 
23 March 2015
 
Cycle 3 Call for Proposals
 
23 April 2015
 
Cycle 3 Deadline
 
28-30 April 2015
 
Operations Review Meeting
JAO
June 2015
 
Cycle 3 panel meetings
 
July 2015
 
Cycle 3 results to PIs
 
Oct 1 2015
 
Start of Cycle 3 observing seasons
 

See also google calendars:
  1. ALMA Science Meetings
  2. ALMA Training Events

-- AlWootten - 2015-02-25

Topic attachments
I Attachment Action Size Date Who Comment
Cycle3_NAStudies_NAASC.pdfpdf Cycle3_NAStudies_NAASC.pdf manage 271 K 2015-03-02 - 14:51 AlWootten ALMA/NA Call for Development Studies Implementation Plan
FeedbackDirector_Feb2015_final.pdfpdf FeedbackDirector_Feb2015_final.pdf manage 76 K 2015-03-02 - 09:58 AlWootten Closeout Summary to Director
f2fFeb2015_report.pdfpdf f2fFeb2015_report.pdf manage 1 MB 2015-03-02 - 11:57 AlbertoBolatto Full version final ASAC report for February meeting
Topic revision: r8 - 2015-03-02, JohnHibbard
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding NRAO Public Wiki? Send feedback